FNC - phone Call with Mr. Smith, and why poly & Al are wrong
posted on
Feb 05, 2008 07:15AM
I just got off the phone with Peter Smith of FNC and confirm the following:
- FNC do not need a camp because they will use the one owned by Biliken Manaement Services that is 12kms NE of FNC's claim adjoining NOT's DE1 claim. This camp is a central camp that has/is been used by all the Mc Fauld's players, including NOT when they first started.
- Ground geophysics with 50m spacings are currently ongoing in partnership with NOT, the results of which will be used to spot the drill holes for the upcoming drill program.
- Biliken Mangment Services will be operating FNC exploration operations, including the upcoming drill program, as they have been for NOT. This company is currently arranging a drill for FNC.
- No partnership, JV or anything else will be done until that anomaly adjoining NOT's DE 1 is tested. His strategy is as I suspected, and as Ihave previously expressed on this board - drill first.
- Drilling will take place "sooner rather than later".
- They are still using the preliminary results of the recent airborne geophysics survey - nobdoy has the final results yet.
Sorry poly and Al, but, I still 'love' you guys...
Regards,
B.