Welcome To The Metanor Resources HUB On AGORACOM

Metanor (MTO-V) is a new Canadian Gold Producer located in Quebec. It reached commercial production on December 1, 2013 and will produce 50,000 oz in calender 2014 with a present all-in cash cost of $1,018US.

Free
Message: G-R-E-A-T drilling results

G-R-E-A-T drilling results

posted on Sep 18, 2008 05:41AM
Sep 18, 2008 08:45 ET

Metanor Drills 6.12 g/t Au Over 37.8m (36.1 m True Width) 80m South of the Open Pit at Barry

VAL-D'OR, QUEBEC--(Marketwire - Sept. 18, 2008) - Metanor Resources Inc. (TSX VENTURE:MTO) is pleased to announce positive and encouraging results from its drilling campaign on the Barry property. Diamond drill hole MB-08-297 intersected a wide mineralized zone grading 6.12 g/t Au over 37.8 m. This mineralized zone is located 80m to the south of the open pit, at 25m below surface and results obtained confirm the significant potential for additional resources in this gold bearing zone.

Diamond drill holes in the Western Pit confirmed the continuity of mineralized zones close to surface and also showed a potential for new resources. Significant intersections were obtained between 5 and 29m below surface and the best intersections include 4.85 g/t Au over 15.0m in hole MB-08-265 and 4.55 g/t Au over 13.5m in hole MB-08-285.

The continuity at depth of the gold-bearing zones between the Western Pit and the East Pit was confirmed with Holes MB-08-262 which returned intersections of 3.48 g/t Au over 7.5m creating potential new resources. Zone 45 (West Pit) was extended towards the south-west by approximately 115m with hole MB-08-287 which intersected a mineralized zone made of disseminated pyrite more than 30m thick. Further results are still pending. The true width is approximately 95% of the core length listed in the following table.



---------------------------------------------------------------------------
DDH'S From To Length Au Gold
(m) g/tm Zones
---------------------------------------------------------------------------
MB-08-297 34.5 72.3 37.8 6.12 Zone 43
---------------------------------------------------------------------------
MB-08-299 30.0 63.0 33.0 2.31 Zone 43
including 30.0 36.0 6.0 6.14
including 59.1 63.0 3.9 7.93
---------------------------------------------------------------------------
MB-08-258 9.0 16.5 6.5 3.65 West Zone
---------------------------------------------------------------------------
MB-08-260 27.0 33.0 6.0 2.65 West Zone
---------------------------------------------------------------------------
and 82.5 88.3 5.8 3.25
---------------------------------------------------------------------------
MB-08-261 42.0 49.5 7.5 2.80 West Zone
---------------------------------------------------------------------------
MB-08-264 40.5 62.0 21.5 2.77 West Zone
including 40.5 53.0 12.5 3.97
---------------------------------------------------------------------------
MB-08-265 39.0 54.0 15.0 4.85 West Zone
---------------------------------------------------------------------------
MB-08-266A 4.7 12.0 7.3 4.52 West Zone
---------------------------------------------------------------------------
MB-08-285 18.0 31.5 13.5 4.55 West Zone
---------------------------------------------------------------------------
MB-08-268 28.5 47.25 18.75 2.90 East Zone
---------------------------------------------------------------------------
MB-08-270 37.5 52.5 15.0 2.51 East Zone
---------------------------------------------------------------------------
MB-08-271 36.0 54.0 18.0 2.42 East Zone
including 36.0 40.5 4.5 3.52
including 48.0 54.0 6.0 4.32
---------------------------------------------------------------------------
MB-08-281 19.5 27.0 7.5 3.18 East Zone
---------------------------------------------------------------------------
MB-08-262 117.0 124.5 7.5 3.48 Gap East&West
---------------------------------------------------------------------------
MB-08-263 169.5 174.0 4.5 2.46 Gap East&West
---------------------------------------------------------------------------
MB-08-287 114.0 117.0 3.0 2.39 SW extension
---------------------------------------------------------------------------



The present drilling campaign confirmed the continuity of mineralized zones extending south-west of the Barry open pit. Results of certain diamond drill holes in this sector show significant gold bearing intersections which made it possible to confirm mineralized zones of the West Pit and its extensions with the other mineralized zones of the East Pit. These drilling results and results of the channelling of the stripping area that will be available in the coming weeks should make it possible to significantly increase the area and resources of the present open pit.

Metanor has implemented and adheres to a strict Quality Assurance/Quality Control program which includes mineralized standards and blanks for each batch of samples. Assay samples are taken from split drill core. Analyses are either performed at Techni-lab S.G.B. Abitibi inc. in Sainte-Germaine Boule, Quebec, ALS-Chemex in Val-d'Or, Quebec, or at the Bachelor Mine laboratory.

Mr. Andre Tremblay, P Eng. is the qualified person pursuant to National Instrument 43-101 and supervised the technical information presented in the news release.



The TSX Venture Exchange does not accept any responsibility for the adequacy or the accuracy of the press release.

For more information, please contact

Metanor Resources Inc.
Serge Roy
CEO
819-825-8678
info@metanor.ca
www.metanor.ca
Share
New Message
Please login to post a reply