Located in the Pacific Ring of Fire

Diverse resource exploration in the Philippines.

Free
Message: Mindoro's CEO Discusses Pre-Feasibility Drilling on Boardroom Radio
Mindoro's CEO Discusses Pre-Feasibility Drilling on Boardroom Radio

EDMONTON, ALBERTA, Jan. 24, 2011 (Marketwire) --

Mindoro Resources Ltd. (TSX VENTURE:MIO) (ASX:MDO)(FRANKFURT:WKN 906167) provides the opportunity to listen to an audio broadcast with Jon Dugdale, President, CEO & Director in a presentation titled "Mindoro Commences Pre-Feasibility Drilling".

To listen, copy the following details into your web browser: brr.com.au/event/72860

The presentation details are as follows:



-- Mindoro Commences Pre-Feasibility Drilling - Mr Jon Dugdale
-- Presented by Jon Dugdale, President, CEO & Director
-- Fri, 21 Jan 2011 10:30am AEST



ABOUT MINDORO

Mindoro is a Tier 1 Issuer trading on the TSX Venture Exchange (MIO), Australian Securities Exchange (MDO) and Frankfurt Stock Exchange (WKN 906167). Mindoro is focused on nickel, copper and gold exploration in the Philippines with a strategy of advancing early-stage opportunities to production or joint venture.

Mindoro has NI 43-101 Mineral Resource estimates on its Agata nickel-cobalt project and NI 43-101 Mineral Resource estimates on its Lobo and Archangel (Kay Tanda) gold-silver projects, as well as an additional 22 porphyry copper-gold prospects. Senior gold producer, Gold Fields, may earn 75% interest in three of Mindoro's projects at Batangas through direct project expenditure.

Mindoro is assessing the potential to develop a value-added direct shipping ore (DSO) nickel operation to generate early cash flow as well as large scale potential for an onsite processing plant in the Surigao District, Mindanao, where the company controls major nickel laterite resources and is drill testing regional targets. An integrated preliminary economic assessment on the Agata nickel laterite project is expected to be completed in the first quarter of 2011, leading to commencement of a prefeasibility study into an integrated on site nickel processing project.

Three drill programs are currently in-progress on the Company's projects including regional nickel drilling at Surigao; copper-gold drilling at Pan de Azucar and gold and copper-gold drilling by Gold Fields at Lobo (Batangas).

The Company's DSO and large scale production objectives are intended to provide an indication of management's current expectations and are still conceptual in nature. It is uncertain that sufficient resources will be established and if established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met.

Tony Climie, P.Geol, is Mindoro's Qualified Person as defined by National Instrument 43-101 and is a competent person as defined by the JORC Code, who is responsible for monitoring the supervision and quality control of Mindoro's exploration programs and who has reviewed and verified the technical information contained in this news release. Mr. Climie is an executive and a director of Mindoro and is a member of the of the Alberta Professional Engineers, Geologists and Geophysicists Association. Mr. Climie has more than five years of experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he has undertaken. Mr. Climie has consented to the release of the technical information in the form and context in which it appears.

The Company's resource estimates were originally prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum classification system. NI 43-101 is a rule developed by the Canadian Securities Administrators that governs how Canadian issuers disclose scientific and technical information about mineral projects and which is broadly equivalent to the JORC Code in Australia. All resource information is also expressed in terms of the JORC Code.

This release may contain forward-looking statements including management's assessments of future plans and operations, and expectations of future production. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty with respect to results of exploration, the uncertainty of estimates and projections relating to production and the uncertainty of the availability of capital). The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company does not undertake to update forward looking statements except where required to do so by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Mindoro Resources Ltd. - Australia
President and CEO
+61 3 9614 5055

jon@mindoro.com

NWR Communications - Australia

+0420 582 887

nathan@mindoro.com

Mindoro Resources Ltd. - Canada
VP Investor Relations
780.413.8189 or Toll Free: 1.877.413.8187

penny@mindoro.com

Aprendo Capital - Germany

+49.821.6089051

robert@mindoro.com
www.mindoro.com

Source: Marketwire Canada (January 24, 2011 - 9:59 AM EST)
Share
New Message
Please login to post a reply