advanced projects

Mexico - Silver // Canada - Gold

Free
Message: Intersects 11.52 g/t Au & 9.13 g/t AU

Intersects 11.52 g/t Au & 9.13 g/t AU

posted on Jan 06, 2009 05:58AM
January 6, 2009
Normabec Intersects 11.52 g/t Au Over 5 Metres and 9.13 g/t AU Over 11 Metres on Pitt Gold
ST-BRUNO, QUEBEC--(Marketwire - Jan. 6, 2009) - Normabec Mining Resources Limited ("NORMABEC" or the "Company") (TSX VENTURE:NMB)(FRANKFURT:N6M) is pleased to announce the first results from its fall drilling program on the Pitt Gold property, located along the Porcupine-Destor Break, some 35 km north of Rouyn-Noranda, in the Abitibi region of Quebec.

From October to December 2008, Normabec completed 9 holes for a total of 5,180 metres of core. All holes targeted extensions of known mineralized zones and more specifically zones 1 and 2 located in the eastern portion of the property.

DRILL HOLE                   FROM       TO   LENGTH     GRADE    VEIN
                               (m)      (m)      (m)   g/t Au

PG2008-08                   341.0    342.0      1.0      1.65
                            354.0    359.0      5.0     11.52     # 1
  including                 356.0    357.0      1.0     18.69
  and                       358.0    359.0      1.0     34.43
                            443.0    444.0      1.0      1.18     # 2
                            455.5    456.0      0.5      1.74
                            505.0    506.0      1.0      1.12

PG2008-09                   353.0    354.0      1.0      1.19
                            451.0    462.0     11.0      9.13     # 1
  including                 452.0    453.0      1.0     16.50
  and                       454.0    455.0      1.0     12.90
  and                       461.0    462.0      1.0     43.60
                            463.0   463.75     0.75      1.25
                            509.0    511.0      2.0     11.05     # 2
                            519.0    520.0      1.0      3.87
Of note, in both of the holes reported above, significant widths and grades are now being returned from zone 1 (11.52 g/t Au over 5 m and 9.13 g/t Au over 11 m). The Company estimates that true widths are approximately 80% of the core lengths indicated above. These two holes were drilled 100 metres apart with hole PG2008-05 located in between (see below). Results are pending for the remaining seven holes of this program.

These excellent results follow on a series of outstanding intersections reported in early 2008 (please see Press Releases dated Feb. 28 and March 18) from the winter drilling program undertaken in the same area (10.43 g/t Au over 3.0 m in PG2008-01, 35.2 g/t Au over 5.0 m in PG2007-07, 21.04 g/t Au over 2.0 m and 31.75 g/t Au over 1.5 m in PG2008-05). Mineralization at Pitt Gold can be followed laterally for 500 metres and vertically for 800 metres, and remains open at depth. Notably, as is common within the prolific Porcupine-Destor region, a large majority of high grade values are found below the 300 meter level.

In the fall of 2008, Normabec acquired the remaining 20% interest in the Pitt Gold property from SOQUEM Inc. and GeoNova Exploration Inc. The interests retained by the former owners have been converted into a 1% NSR royalty to each. The royalty can be bought back for $1 million.

Samples were prepared and assayed at Technilab of Sainte Germaine de Boule and were subjected to fire assay with AA finish. Normabec has implemented a QAQC program which includes systematic use of standards, blanks and duplicates. Values above 3 g/t Au are systematically re-assayed.

The 2008 drilling program was carried out under the supervision of Mr. Pierre O'Dowd, geologist and Qualified Person as per National Instrument 43-101.

Normabec is a junior mining exploration company with a portfolio of advanced exploration projects including: the 100% owned Pitt Gold Project in Quebec and the 100% owned Real de Catorce Silver Project in Mexico.
Share
New Message
Please login to post a reply