Northern Gold Intersects 5.47 g/t Au OVER 17.3 m atJonpol Deposit
posted on
Aug 29, 2013 11:09AM
The company’s strategic direction is to continue to seek out properties and claims in the area known to have high value gold targets and to execute the necessary work to rapidly move these projects towards advanced exploration and mine development stages.
TORONTO, ONTARIO--(Marketwired - Aug. 29, 2013) - NORTHERN GOLD MINING INC. (TSX VENTURE:NGM) ("Northern Gold" or the "Company") is pleased to announce results from 20 diamond drill holes from its surface diamond drilling program carried out on its wholly-owned Jonpol Deposit of the Golden Bear Project, 100 km east of Timmins, Ontario. The 20 drill holes totaled 5,984 metres.
Drill assay highlights for the drill holes include:
Martin Shefsky, President and CEO of Northern Gold, comments: "These results continue to confirm the continuity and grades of the mineralized structures comprising the Jonpol Deposit. Eighteen of the 20 drill holes reported intersected significant gold mineralization, highlighted by a 17-metre interval grading over 5 g/t gold. Also, the potential for resource expansion exists with both the RP and JD Zones remaining open at depth."
Table 1 - Jonpol Assay Results * - These results are significant drill assays from 20 drill holes on the Jonpol Deposit. JP series drill holes are either infill into or step out from the known Jonpol Deposit resources while GT series drill holes are geotechnical holes designed to test ground or crown pillar stability.
Hole | Zone | Section | From (m) | Inc (m) |
To (m) |
Interval (m) |
Au g/t Un-Cut |
Au g/t Cut |
|||||||
GGT-01 | JP Zone | N/A | 95.00 | 116.00 | 21.00 | 2.99 | 2.53 | ||||||||
108.60 | 109.35 | 0.75 | 47.02 | 34.28 | |||||||||||
193.00 | 203.00 | 10.00 | 1.08 | ||||||||||||
GGT-02 | East Zone | N/A | 117.00 | 126.00 | 9.00 | 3.66 | |||||||||
125.00 | 126.00 | 1.00 | 9.01 | ||||||||||||
197.00 | 198.00 | 1.00 | 3.48 | ||||||||||||
JDGT-02 | JD Zone | 27+50W | 83.00 | 87.00 | 4.00 | 1.70 | |||||||||
JP-12-03 | JD Zone | 26+00W | NSV | ||||||||||||
JP-13-07 | JD Zone | 25+50W | 281.00 | 284.00 | 3.00 | 4.46 | |||||||||
JP-13-08 | JD Zone | 25+50W | 107.00 | 108.00 | 1.00 | 2.30 | |||||||||
JP-13-09 | JP Zone | 23+50W | 249.00 | 252.50 | 3.50 | 2.60 | |||||||||
328.00 | 331.00 | 3.00 | 6.37 | ||||||||||||
JP-13-12 | RP Zone | 20+75W | 180.00 | 181.50 | 1.50 | 2.82 | |||||||||
JP-13-13 | RP Zone | 20+25W | NSV | ||||||||||||
JP-13-14 | RP Zone | 20+25W | 45.00 | 46.00 | 1.00 | 8.56 | |||||||||
JP-13-15 | JD Zone | 26+00W | 166.00 | 166.50 | 0.50 | 7.27 | |||||||||
280.70 | 286.00 | 5.30 | 1.89 | ||||||||||||
280.70 | 282.20 | 1.50 | 3.25 | ||||||||||||
JP-13-16 | SEDIMENT | 24+00W | 158.00 | 159.00 | 1.00 | 1.79 | |||||||||
JP-13-16A | SEDIMENT | 24+00W | 475.00 | 476.00 | 1.00 | 2.49 | |||||||||
JD HW | 741.00 | 741.70 | 0.70 | 2.66 | |||||||||||
JP-13-17 | JD Zone | 22+50W | 62.00 | 68.00 | 6.00 | 3.21 | |||||||||
66.00 | 68.00 | 2.00 | 5.79 | ||||||||||||
JP-13-20 | RP Zone | 18+25W | 329.00 | 331.3 | 2.30 | 1.16 | |||||||||
442.50 | 444.00 | 1.50 | 3.53 | ||||||||||||
JP-13-21 | RP Zone | 18+25W | 242.7 | 243.1 | 0.40 | 4.80 | |||||||||
251.00 | 252.00 | 1.00 | 3.17 | ||||||||||||
JP-13-25 | RP Zone | 18+75W | 333.00 | 335.00 | 2.00 | 2.98 | |||||||||
JP-13-26 | RP Zone | 19+75W | 174.00 | 174.50 | 0.50 | 1.53 | |||||||||
JP-13-27 | RP Zone | 19+75W | 109.00 | 139.00 | 30.00 | 2.24 | |||||||||
129.80 | 135.20 | 5.40 | 5.23 | ||||||||||||
255.00 | 258.00 | 3.00 | 4.06 | ||||||||||||
JP-13-28 | RP Zone | 20+75W | 32.50 | 39.00 | 6.50 | 2.10 | |||||||||
84.00 | 101.30 | 17.30 | 5.47 | ||||||||||||
99.30 | 101.30 | 2.00 | 21.59 |
*reported intervals are downhole lengths and not true widths. High grade assays are cut to 34.28 g/t |
NSV - no significant values |
Geotechnical Drilling
Drill Holes GGT-01 and GGT-02 were geotechnical holes drilled along strike of the mineralization to test the ground stability of several cross faults that intersect the Jonpol zones. Both holes successfully intersected mineralization and the interpreted cross faulting. Drill hole JDGT-02 was drilled as part of a crown pillar support assessment in the JD zone west of the Jonpol mine shaft and portal. The geotechnical program was conducted in support of an ongoing closure plan development for the Jonpol mine. All geotechnical holes were drilled with HQ triple tube oriented core and geotechnical core logging was completed by Tony Gilman, M.Sc., P.Eng., of Terrane Geoscience of Halifax, NS.
JD Zone
JP-12-03, JP-13-07, and JP-13-08 were infill drill holes in the upper portion of the JD zone. JP-13-15 was drilled 50m below high grade intercepts in JP-12-04 (released March 26, 2013) and successfully intersected a broad zone of albite vein type mineralization along with minor visible gold similar to that intersected in JP-12-04. Exploration remains open down dip from this intercept.
JP Zone
JP-13-09 and JP-13-17 were drilled as infill holes in the JP Zone close to the existing underground workings; both holes intersected mineralization consistent with surrounding intercepts. JP-13-16 and 16a were designed to test the deeper extension of the JP zone but due to complications intersecting several strong fault structures the hole did not reach target depth.
RP Zone
Drill holes JP-13-12, 13, 14, 20, 21, 25, 26, 27, and 28 were all drilled to infill the upper portions of the RP zone to the east of the Jonpol mine shaft and portal. Several of the holes intersected significant values and demonstrated good continuity with historical drilling on the RP zone. The RP zone is now being interpreted as the eastern continuation of the JP zone showing similar mineralogical characteristics. Exploration within the RP zone remains open to depth.
Table 2 - Location and Initial Orientation of Drill Holes |
Hole ID | Section Line West |
Section Line North |
Length | Azimuth (True) |
Inclination (degrees) |
|||||
GGT-01 | N/A | N/A | 204 | 263 | -65 | |||||
GGT-02 | N/A | N/A | 198 | 267 | -65 | |||||
JDGT-02 | 27+50W | 15+50N | 117 | 330 | -50 | |||||
JP-12-03 | 26+00W | 14+85N | 249 | 340 | -45 | |||||
JP-13-07 | 25+50W | 14+45N | 303 | 340 | -45 | |||||
JP-13-08 | 25+50W | 14+90N | 273 | 340 | -45 | |||||
JP-13-09 | 23+50W | 14+05N | 357 | 340 | -60 | |||||
JP-13-12 | 20+75W | 15+05N | 333 | 340 | -60 | |||||
JP-13-13 | 20+25W | 15+10N | 354 | 340 | -60 | |||||
JP-13-14 | 20+25W | 15+70N | 249 | 340 | -60 | |||||
JP-13-15 | 26+00W | 13+95N | 330 | 340 | -60 | |||||
JP-13-16 | 24+00W | 12+25N | 460 | 340 | -70 | |||||
JP-13-16A* | 24+00W | 12+25N | 330 | 340 | -70 | |||||
JP-13-17 | 22+50W | 15+45N | 123 | 340 | -45 | |||||
JP-13-20 | 18+25W | 13+50N | 444 | 340 | -45 | |||||
JP-13-21 | 18+25W | 14+00N | 345 | 340 | -45 | |||||
JP-13-25 | 18+75W | 13+95N | 445 | 340 | -45 | |||||
JP-13-26 | 19+75W | 15+75N | 270 | 340 | -60 | |||||
JP-13-27 | 19+75W | 15+40N | 336 | 340 | -60 | |||||
JP-13-28 | 20+75W | 15+65N | 264 | 340 | -60 |
Note * - hole JP-13-16A was wedged off hole JP-13-16 starting at a drill length of 441 metres, and extended 330 metres to a total length of 771 metres.
Jonpol Deposit drill plan and long section will be posted on the Company's website at: http://northerngold.ca/golden-bear-project/jonpol-deposit.
Quality Assurance/Quality Control
Northern Gold has implemented comprehensive, industry standard quality-assurance, quality-control protocols for diamond drilling, core recovery, handling, sampling, shipping and assaying. Details of these best practice principals can be viewed on the Company's website at: http://www.northerngold.ca/QA-QC.php.
The technical aspects of this press release have been reviewed and approved by Gary Nassif, M.Sc., P.Geo., Manager Exploration Services of Northern Gold and the "Qualified Person" as defined by National Instrument 43-101 for the Golden Bear Project.
About Northern Gold
Northern Gold is a TSXV-listed gold company based in Toronto, Ontario. The Company's main focus is the exploration and development of its prospective mineral properties at the Golden Bear Project in the Larder Lake Mining Division, northeastern Ontario. Northern Gold has a portfolio of advanced exploration projects, including the Jonpol and Garrcon Deposits and the Buffonta Property. Recent transactions, including the Harker-Holloway Property acquisition and the amalgamation with Victory Gold Mines Inc., add to the Company's regional consolidation strategy along the Destor-Porcupine Fault Zone.
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved of the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking statements are characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, Northern Gold's strategic partnership and issuances of securities, and is based on, among other things, the opinions and assumptions of management considered reasonable as of the date of this news release. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain required regulatory approvals, changes in equity markets, fluctuations in commodity prices, and other risks involved in the mineral exploration and development industry, including those risks set out in Northern Gold's public documents filed on SEDAR. Although Northern Gold believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Northern Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
Northern Gold Mining Inc.
Martin Shefsky
President & Chief Executive Officer
647.297.8793
mshefsky@northerngold.ca
Northern Gold Mining Inc.
Eric Szustak
Manager, Business Development
905.330.7948
eszustak@northerngold.ca
www.northerngold.ca