Power should be completed and constuction should be started by April 2008. And hopefully a contract for $190 per tonne.
http://www.palladonventures.com/s/Pr...
Transmission line poles and equipment have been delivered and are scheduled for installation in late December 2007, to be followed by the installation of a 138kV power line connecting Iron Mountain to the Cedar City power grid. The power connection is scheduled to be completed by March 2008.