Message: Talked with Blair Merriam, more news shortly

Let make some conclusion from this talk:

First of all Parkway project:

The Parkway Project consists of 4 integrated parts. A steel high-pressure natural gas transmission pipeline. A steel gathering system connecting the transmission line to 4 existing wells. The wells themselves and the 1,700 acre lease.

The transmission line is a welded, x-rayed and tested 6” epoxy fusion coated steel pipeline approximately 3 ½ miles in length connecting the field to the Delta Natural Gas Co. pipeline, which operates around 150-200 psi.

This project consists of approximately 1,700 acres of leases with 4 operating wells, producing both gas and/or oil. There are more shut in well bores available to be re-worked and placed online. A number of landowners, realizing there is a new transmission line in the area, have contacted us about leasing opportunities and field personnel have reported that there are more potential wells for hookup.

Parkway is really paying off nicely .

Then Whitley field:

The Whitley County field is located near Emlyn, just south of Williamsburg, Kentucky.

We are compiling and verifying the acreage position at this time but it is believed to be approximately 1,200 acres. There are 5 wells (2 producing) and the gathering system connects the producing wells to the Delta Natural Gas Co. pipeline, which operates around 150 psi. and consists of approximately 7 miles of mostly 3” plastic gathering system with some 2” plastic and fiberglass.

He is expecting to concentrate on Whitley field after the Parkway.

And finally

Clinton County Field
This region consisting of an 830 acre lease with 1 shut in gas well. When this well was drilled, it had a show of oil at 1,818 feet that was determined by the previous engineers to be completed at a later time. Wildcat Energy believes that time has come. We will be developing the engineering studies necessary to move forward with this project.

Clinton field will be some time in the future as the well is shut in .

News will be out shortly, maybe today, maybe on monday, yeterday somebody buyed 400 000 shares for 0.16$($64.000) . Also I saw lot of asks above 0.3$ . That means that somebody knows that something big comming very soon and we will trade in some other trading range, maybe between 0.25$ and 0.3$ . Time will tell but everything from chart, news flow, buying pressure point to us that that will be very soon! So, because we are waiting for some great news here, this is time to buy!!! FYI in Frankfurt is right now 0.102€ and that means 0.162$, who knows if we will see these prices any more, the company is stronger than ever and chart telling to us only one, thing green days and weeks ahead for pltg, time to buy!!!