High-Grade Gold Projects

Red Lake and Geraldton are Canada's PREMIER addresses for gold

Free
Message: Premier Gold Confirms New High-Grade Extensions at Mercedes

 

 
2018-08-02 06:00:00 AM ET (CNW Group)
   
   

Drill results include 21.95 m at 36.65 g/t Au and 171.30 g/t Ag

PREMIER GOLD MINES LIMITED ("Premier" or "The Company") (TSX:PG) is pleased to provide an exploration update, including the confirmation of high grade extensions, at the Company's 100%-owned Mercedes Mine, located in the State of Sonora, Mexico. The ongoing 40,000 metre surface and underground drill programs include definition and expansion of the main gold bearing horizons and testing new zones on the property.

Underground drilling at the Rey de Oro deposit, one of several zones being brought into production this year, has confirmed the extension of a high-grade vein system that exhibits some of the best widths drilled to date. Recent highlights include:

    --  UG-R018-002 with 6.21 g/t Au and 101.83 g/t Ag across 16.55
        metres
    --  UG-R018-006 with 36.65 g/t Au and 171.30 g/t Ag across 21.95
        metres
    --  UG-R018-007 with 8.10 g/t Au and 121.32 g/t Ag across 20.50
        metres
    --  UG-R018-008 with 8.33 g/t Au and 67.66 g/t Ag across 9.20
        metres


"These high grade results and good widths are similar to our success at the Aida vein zone intersected earlier this year and confirms our belief that substantial potential exists to expand the mine life at Mercedes" stated Charlie Ronkos, Executive Vice-President of Premier. "These initial intercepts suggest a zone with grades well in excess of the current reserve grade at Mercedes".

Rey de Oro

Additional drills are being mobilized to Rey de Oro in order to continue step-out and delineation drilling of this vein extension. These results include some of the widest vein intercepts on the property and are located proximal to recently constructed underground mine workings (see Figure 1 below).

Table 1 summarizes recent intercepts from 2018 drilling at Rey de Oro.

Table 1 - Highlight drill intercepts from the Rey de Oro vein target

          Hole ID      Coordinates    Azimuth/        Elevation               Comment            From         To          Intercept         Intercept          Au          Ag
                           (m)           Dip                                                      (m)         (m)            (m)           True Width        (g/t)        (g/t)
                                                                                                                                               (m)
    ---                                                                                                                                        ---


          R18-204D   552166N/3357830E          17/-55                    1287                          119.20      120.70             1.50              1.40         5.45         16.00
          --------   ----------------          ------                    ----                          ------      ------             ----              ----         ----         -----

          R18-205D   552335N/3357703E          25/-55                    1278  Exploration             129.70      134.20             4.50              4.35         2.59         13.33

                                                                              and                     154.22      156.20             1.98              1.70         2.59          6.02
                                                                              ---                     ------      ------             ----              ----         ----          ----

          R18-206D   552335N/3357703E          25/-55                    1278                          150.20      151.20             1.00              0.95         3.55          6.00

                                                                              and                     152.20      154.20             2.00              1.90         3.20          6.00

                                                                              and                     155.20      155.70             0.50              0.50         2.36          9.00
                                                                              ---                     ------      ------             ----              ----         ----          ----

        UG-RDO18-001 552166N/3357830E            61/1                    1062  Infill                  101.95      109.00             7.05              5.45         7.81         71.12

                                                                              Including               105.00      108.05             3.05              2.75        12.71         86.38

        UG-RDO18-002 552082N/3357855E            25/5                    1063  Infill                   77.80       86.92             9.12              7.15         8.77        259.46

                                                                              and                      88.75       91.50             2.75              1.90         1.23        108.00

                                                                              and                      94.00      110.55            16.55             11.50         6.21        101.83

                                                                              Including               103.35      106.75             3.40              2.55        20.10         82.08

                                                                              and                     117.43      118.95             1.52              1.20         3.40         31.00
                                                                              ---                     ------      ------             ----              ----         ----         -----

        UG-RDO18-003 552082N/3357855E           25/-8                    1062  Delineation              74.50       80.60             6.10              4.75         1.64        146.50

                                                                              and                      85.20       88.35             3.15              3.10         1.76        102.00

                                                                              and                     105.00      108.05             3.05              2.90         1.76        102.00
                                                                              ---                     ------      ------             ----              ----         ----        ------

        UG-RDO18-004 552082N/3357855E            41/5                    1062  Delineation              74.50       80.00             5.50              4.25         1.55         93.90
                     ----------------            ----

        UG-RDO18-006 552082N/3357855E             8/3                    1062  Delineation              89.15      111.10            21.95             15.50        36.65        171.30

                                                                              Including                89.15      105.70            16.55             11.10        47.94        200.16

                                                                              and                     141.60      149.22             7.62              5.25         3.46         42.59

                                                                              and                     161.42      164.90             3.48              2.45         3.07          5.00
                                                                              ---                     ------      ------             ----              ----         ----          ----

        UG-RDO18-007 552049N/3357880E           230/4                    1060  Infill                   62.53       83.06            20.53             18.55         8.10        121.32

           (1060)

                                                               Including                   70.15        73.20        3.05             2.90             14.91       107.87

                                                                              Including                79.30       81.80             2.50              2.35        30.70        165.50

                                                                              and                      88.75       92.30             3.55              3.30         2.78         40.00

                                                                              and                      94.55       96.07             1.52              1.45         2.49         19.00
                                                                              ---                      -----       -----             ----              ----         ----         -----

        UGRDO18-008  552049N/3357880E           22/-4                    1060  Infill                   86.92       88.45             1.53              1.40         2.65         37.00

           (1060)

                                                                              and                      91.35      100.55             9.20              6.75         8.33         67.66

                                                                              Including                94.55       97.60             3.05              2.75        16.10        113.45

                                                                              and                     121.50      123.10             1.60              1.46         2.97          9.00
                                                                              ---                     ------      ------             ----              ----         ----          ----

Aida

A surface and underground drill program is underway to define the high-grade Aida target that is located to the west of the main Mercedes vein (see Figure 2) and proximal to existing mine workings. Broad zones of mineralization have returned multiple high-grade intercepts as highlighted in Table 2.

Table 2 - Highlight drill intercepts from the Aida target

    Hole ID    Coordinates    Azimuth/           Elevation       Comment   From         To          Intercept       Intercept         Au          Ag (g/t)
                   (m)           Dip                                        (m)         (m)            (m)          True Width       (g/t)
                                                                                                                       (m)
    ---                                                                                                                ---


    -864D    549003N/3355797E            202/-46            1176  Infill          93.50       95.00            1.50             1.45         2.79            11.00

                                                                 and             96.50       99.08            2.58             2.37         2.40            41.18

                                                                 and            100.17      104.50            4.33             3.35         3.12            43.25

                                                                 and            118.00      119.00            1.00             0.90         2.54             9.00

                                                                 and            135.50      141.50            6.00             4.05        12.04             8.91

                                                                 Including      137.00      138.00            1.00             0.90        52.50            13.00

                                                                 and            167.00      170.00            3.00             2.47         4.84            38.50
                                                                 ---            ------      ------            ----             ----         ----            -----

    M18-865D 549004N/3355798E            212/-48            1176  Infill          94.50       95.00            0.50             0.45         2.96            12.00

                                                                 and             95.85       98.85            3.00             1.90         3.92            36.75
                                                                 ---             -----       -----            ----             ----         ----            -----

    M18-866D 549004N/3355798E            212/-48            1176  Infill          83.50       84.25            0.75             0.62         1.84            24.00

                                                                 and             84.25       85.68            1.43             1.40         3.77            27.47
                                                                 ---             -----       -----            ----             ----         ----            -----

    M18-867D 548910N/3355750E             70/-60            1141  Infill          60.45       62.20            1.75             1.00         2.77            45.71

                                                                 and             66.10       67.00            0.90             0.70         2.10            28.00

                                                                 and             74.20       75.40            1.20             0.90         3.65            57.00
                                                                 ---             -----       -----            ----             ----         ----            -----

    M18-869D 548814N/3356240E            219/-54           11615                 245.35      246.35            1.00             0.80         3.08             8.00

                                                                 and            248.35      249.35            1.00             0.80         1.96             7.00
                                                                 ---            ------      ------            ----             ----         ----             ----

    M18-870D 548834N/3356265E            218/-54            1174  Infill         292.25      296.25            4.00             2.85         9.45            40.85

                                                                 Including      293.25      295.20            1.95             1.42        15.69            50.70
                                                                 ---------      ------      ------            ----             ----        -----            -----

    M18-883D 54882N/3356048E             214/-50            1158  Infill          93.00       94.68            1.68             1.15        11.92            12.67

                                                                 Including       93.45       94.68            1.23             0.91        15.85            10.00
                                                                 ---------       -----       -----            ----             ----        -----            -----

    M18-884D 548854N/3356048E            229/-58            1158  Infill         105.45      107.45            2.00             1.01         5.79             4.50

                                                                 Including      106.45      107.45            1.00             0.80        11.20             4.00
                                                                 ---------      ------      ------            ----             ----        -----             ----

    M18-887D 548800N/3358262E            150/-45            1145  Infill         163.20      164.15            0.95             0.75         9.30            57.63

                                                                 Including      163.20      163.70            0.50             0.40        17.35            51.00
                                                                 ---------      ------      ------            ----             ----        -----            -----

    M18-888D 548814N/3356240E         219.50/-45            1164  Infill         200.20      207.85            7.65             4.45         8.80            16.72

                                                                 Including      202.40      204.20            1.80             1.00        24.11            19.44
                                                                 ---------      ------      ------            ----             ----        -----            -----

    M18-892D 548805N/3356198E             214/54            1169  Infill         199.43      207.80            8.37             5.10         3.71            27.40

                                                                 Including      205.30      207.80            2.50             1.85         5.69            27.40
                                                                 ---------      ------      ------            ----             ----         ----            -----

    M18-893D 548911N/3355915E            216/-54            1155  Infill         106.30      107.20            0.90             0.75         4.43            48.00
    -------- ----------------            -------            ----  ------         ------      ------            ----             ----         ----            -----

    M18-894D 548911N/3355915E                                    Infill          76.20       80.58            4.38             2.55         5.26           152.06
             ----------------

    M18-895D 548911N/3355915E            228/-50            1155  Infill         129.80      132.18            2.38             1.45         4.33            91.16

                                                                 Including      131.30      131.85            0.55             0.40        13.40           113.00

                                                                 and            151.30      152.30            1.00             0.65         1.74            40.00

                                                                 and            153.50      154.30            0.80             0.60         4.23            46.00
                                                                 ---            ------      ------            ----             ----         ----            -----

    M18-896D 548916N/3355968E            217/-46            1158  Infill         144.43      146.20            1.77             1.35         2.48            49.59
             ----------------            -------            ----

    M18-897D 548916N/3355968E            228/-53            1158  Infill         160.30      163.30            3.00             1.95         5.06            81.66

                                                                 and            167.30      169.30            2.00             1.45         2.68            81.50

                                                                 and            171.30      174.56            3.26             2.05         2.64           136.25
                                                                 ---            ------      ------            ----             ----         ----           ------

    M18-898D 549004N/3355797E            234/-59            1178  Infill         108.70      113.20            4.50             2.75         3.65            53.33
             ----------------            -------            ----

    M18-899D 549004N/3355797E            155/-77            1178  Infill          95.20      117.70           22.50            14.55        12.11            25.74

                                                                 Including      111.46      116.20            4.74             3.15        45.88            24.34

                                                                 and            132.20      135.08            2.88             1.35         5.11            37.30
                                                                 ---            ------      ------            ----             ----         ----            -----

The 2018 drill program will also test for extensions of the known vein systems, and for new target areas on the property. The primary target areas are as follows (see Figure 2):

  1. Drilling at the Axis target located to the west of the main
     Mercedes vein, has discovered a broad zone of low-grade
     mineralization with assays of up to 0.64 g/t Au and 0.79 g/t Ag
     across 31.5 metres;
  2. Once the drift has been sufficiently established in H2 2018,
     drilling is expected to begin on the Marianas vein, located along
     the main Mercedes vein trend; and
  3. Continued definition and step-out drilling at Diluvio and Lupita
     that were recently brought into production.


Production at Mercedes is expected to be weighted to the second half of the year owing to changes in the mining methods, the required additional drilling at the new Diluvio deposit and delays in permitting associated with the ventilation raise at Rey de Oro. Stope mining has commenced at Diluvio and the ramp up in production from Rey de Oro continues. As a result of these initiatives, monthly production in July has been the best so far in 2018.

Premier Gold Mines Limited is a gold producer and respected exploration and development company with a high-quality pipeline of precious metal projects in proven, accessible and safe mining jurisdictions in Canada, the United States, and Mexico.

Stephen McGibbon, P. Geo., Executive Vice-President, Corporate and Project Development, is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. Mercedes assay results are from core samples sent to ALS Chemex, an accredited mineral analysis laboratory in Lima, Peru or Vancouver, British Columbia, for preparation and analysis utilizing both fire assay and ICP methods. For a complete description of Mercedes's sample preparation, analytical methods and QA/QC procedures refer to the technical report for the Mercedes Mine dated April 18, 2018 (effective date December 31, 2017), entitled "Technical Report on the Mercedes Gold-Silver Mine, Sonora State, Mexico."

This Press Release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in Premier's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Premier disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise­­­­, except as required by law.

SOURCE Premier Gold Mines Limited

View original content with multimedia: http://www.newswire.ca/en/releases/archive/August2018/02/c7483.html

SOURCE: Premier Gold Mines Limited

Ewan Downie, President & CEO, Phone: 807-346-1390, e-mail: Info@premiergoldmines.com,
Web Site: www.premiergoldmines.com
Share
New Message
Please login to post a reply