I think this is a fantastic opportunity to by BIM. Massive high grade iron-ore, no processing straight to blast furnace and a 20 possibly forty year mine life. Not sure haven't checked in a while but over $100 million in cash. September, a 54,000 tonne bulk sample shipped to ThyssenKrupp Steel in Europe for the blast furnace for final a metallurgical test and the final confirmation of the superior quality of the high grade Mary River iron ores. 67-68% iron.