TODAY'S DISCOVERY, TOMORROW'S FUTURE

Creating shareholder wealth by advancing gold projects through the exploration and mine development cycle.

Free
Message: Re: Gold at highs... KXL near lows... BRENBAR PROJECT drill hole BB09-01
2
Nov 03, 2009 12:35PM

Poor Drill Results (?) can certainly be debated.

Table below reflects BB09-01 intersected some gold in the core sample between 60.9 and 185.5 metres. The Sep 14, 2009 news release only highlighted that BB09-01 intersected 1.7 metres grading 10.35 gpt gold (0.30 opt) including 0.5 metres grading 32 gpt gold (0.93 opt).

With varying degrees of gold found within this 120 metres, it most certainly shouldn't be looked at as simply something that is a point of interest.

BRENBAR PROJECT

BB09-01

60.9

61.9

1.0

2.38

BB09-01

139.4

140.4

1.0

3.25

BB09-01

147.4

148.3

0.9

5.85

BB09-01

183.8

185.5

1.7

10.35

including

184.4

184.9

0.5

32.00

Share
New Message
Please login to post a reply