Kind of you to write, Dutchie. I just enjoy the story and got inspired by the presentation and hanging with the KXL people at the booth.
P.S. I _swear_ I did not pay Dutchie to write his post :) (but thanks)
Hope to have more soon.
Then unfortunately we have to wait, unless any drill news leaks out. Drilling starts right away but analysis will take a month or two. 43-101 for PDAC before then, though.