Message: recap..NR ..

In order to stay on our timeline for development, Prodigy has had to expand its drilling program to insure that the upcoming feasibility study incorporates the largest and highest quality drill data possible.

Prodigy currently has four drills on site and expects to add another drill rig in the coming weeks.We are sourcing three additional drill rigs to insure that this program is completed in a timely manner.

(8 drill rigs...that should speed things up.)

The Magino feasibility study is expected to be completed in late 2012, allowing us to begin the formal permitting process early in 2013 and target production in late 2015."

Resource Definition: 27,000 metres of diamond drilling has been approved for resource definition. The drilling will take place entirely within the December 2011 PEA pit shell.

(27,000meters of new drilling within the area already defined (2011Pit Shell) we already know there is a ton of gold in that area so every figgin inch of drill core is going to add to the total known ounces..that is huge.)

Resource Expansion: 15,000 metres of diamond drilling are allocated for resource expansion. Recently reported drill results (January 24, 2012) confirm the potential to expand the Magino gold resource adjacent to the proposed open pit and in other areas of the project.

More drilling in confirmed gold structure is only going to increase the hoard of gold

This program will target those areas that can augment the minable gold resource and therefore influence the ultimate size of the mill, the proposed gold production rate and mining equipment requirements.

(Once we know how much gold we have we can size up the equipment..if we have 5 million ounces we will probably size for 8-10....additional drilling will continue long after we have the mill ruinning and we don't want to be caught with a little mill that will taKe forever to mill the gold..we want a payback..besides ,an oversized mill is easier on the equipment and will just cut down on the milling years..say 8 years mine life instead of 11..)

Target areas include the southwest extension of the Magino deposit and the Lovell Lake area.