Ok since you asked for it.
We should have all the assays from the old core by January. There are thousands of meters of core that was not assayed. We are now looking at this project as a large low grade deposit with some higher grades.
We should have holes 179-182 in the next 3 weeks.
John will be back in Mongolia next week. From what I understand they are waiting on everyone to be able to be there at the same time. (optimistically hope it will be this month but 4 more months is the norm)