.
The final four (4) holes, of the 2010 drill program, totaling 1,264 meters have been drilled at the end of December 2010. All the holes intercept significant sulphide mineralization over significant thickness. Results are pending.
..i sure like the sound of this, over significant thickness !..good by - products on both properties. Traps7