Don't forget that the hinges could extend all the way to SG3 and beyond. Also no deep drilling has been done at SG1 so maybe the high grade starts deeper there. If the 0.5 Km between the 2 new hinges proves to be mineralized just imagine the tonnage potential.
The signifigance of waiting for the hinge bulk sample to be run thru the mill is that if it proves up the grades on the drill cores, then the average 1 oz cutoff won't come in to play and the high grade veins such as the 6 oz per ton can be included in the resource calculation which will add significant ozs to 43-101. I believe that they will want some of the new hinge drilling to be included also and that is why the 43-101 wil probably not be out until July. They have huge stacks of core waiting to be processed and sent for check assays. Geologists can't keep up to surface drills.
T