Can any of our panel of resident experts shed some light on some of the following in terms of the actual work to perform or produce and some associated costs:
A) 43-101....I expect this is not a cheap document to have produced. With SGR continually adding holes to the mix before any report is actually produced, this must be a fairly expensive proposition. Any ideas as to how much, even in general?
B) Assays....is this work expensive? How is the rate determined...so much a foot? Volume discount? Type of rock? Time to actually perform the test?
Thanks in advance.
SG