Welcome to the San Gold HUB on AGORACOM

San Gold Corporation - one of Canada's most exciting new exploration companies and gold producers.

Free
Message: Re: Dale Ginn Interview ..follow the Map
5
Jun 29, 2009 10:13PM
1
Jun 29, 2009 10:14PM
1
Jun 29, 2009 10:26PM
1
Jun 29, 2009 10:36PM

..kinda filled in the blanks from Ricks ( Director ) previous interview. Ruff, i noticed Dale mentioned that going West, after the Emporer, they have the Gold Cup. I was just curious if you told Dale to Read our post, as he seems to being following our map way of thinking and offering future projections. Dale looking forward::after you reach the Vanson Town site, keep going West young man, here is whats in store.ThePoundmaker Deposit lies within the Clinton-Poundmaker tonalite intrusion and is a shear-hosted, high-grade gold, quartz vein system. Previous diamond drilling conducted on the deposit by Wildcat includes holes 2001-1 to 8 inclusive (drilled in 2001) and 2002-1 to 6 inclusive (drilled in 2002) for a total of 3143 meters. The present drill campaign consisted of 10 holes (2004-1 to 10 inclusive) with a total 1109meters drilled. A longitudinal diagram is presented which indicates all drilling conducted since 2001 (excluding 2001-6, 2002-6, and 2004-9; discussed below). Please see www.kitco.com, www.stockhouse.ca or www.wildcat.ca.

Near-surface high-grade mineralization has been intersected immediately southeast of the deposit shaft. Drill intercepts in this area include holes 2004-3 (41.5g/t over 0.6m), 2001- 2 (5.7 g/t over 3.0m), 2001-3 (12.1 g/t over 0.45m, 20.2 g/t over 1.1m), 2001-4 (14.9 g/t over 0.42m) and 2001-7 (13.7 g/t over 1.4m). This mineralization is open along strike to the southeast. The down plunge extent of this near-surface mineralization is also poorly constrained and remains open to the southeast. This conclusion is supported by the fact that hole 2002-5 intersected underground workings and hole 2002-6 (terminated “early” due to spring thaw) intersected weak mineralization at the end of the hole.

In 2002, hole 2002-1 intersected 23.3 g/t gold over 0.6 meters, 167 meters vertically below surface. This mineralization may be (?) part of the down plunge extension of the near surface mineralization. The extent of this high-grade, but narrow width, mineralization will only become apparent with further drilling.

Hole 2004-9tested surface alteration and mineralization approximately 75 meters north- northwest of the shaft. A shear zone yielding 0.5 g/tonne over 2.0 meters was encountered. Relationship of this shear to the Poundmaker shear has not been resolved. The intervening area between this hole and the shaft has not been drill tested.

Since 2001, three drill holes intersected underground workings including 2002-3 and 5 and 2004-8. Assay intervals are not available for these holes.(Mine plans, locating these workings, are not available.)

Holes 2001-6 and 2002-6 are not indicated on longitudinal plan because these holes did not reach the plane of mineralization.

This phase of drilling has clearly indicated two discrete zones of auriferous mineralization. Consequently, a re-examination and re-interpretation of all previous drill data is required to redefine mineralized zones. Section, level and longitudinal plans utilizing 3D modelling software will be undertaken to help resolve the distribution of gold mineralization at the Poundmaker deposit.

Subsequent to the latter work a systematic ‘tier’ drilling is planned to fully evaluate the potential of the Poundmaker deposit. Drilling will test the strike and down plunge extent of near surface mineralization, especially to the southeast, as indicated on the longitudinal diagram. This drilling will be conducted later in the year.

6
Jun 29, 2009 11:21PM
Share
New Message
Please login to post a reply