All of the previous dicoveries that have mineable widths and enough ore to be considered mines are on hold for the time being. With the Discovery of the L13 and Cohiba so close to the main mine there is a refocus to develope the higher grade first, to maximize ounces with the current crusher and mill. Both L13 and Cohiba will be supplying 250 tons a day in the future. It was 18 months from discovery to working mine at the Hinge, however with the Hinge ramp already in place L13 and Cohiba should be on line quicker than that. Also cash flow from the hinge will pay for the infrastructure to get into the new zones. The company was actually mining some of the lower grade ore and decided to mothball those operations so as to concentrate on the >12 gram deposits. If they continue to find high grade near surface it could be many years before they revisit lower grade deposits. As for Timmins I spent some time with the Melkior people that have been drilling at the Zam Zam deposit and they told me that SGX has been doing a lot of work over there and they were sharing info and personel. We should hear some updates in that area soon. As for the other Timmins property I have not heard.