Welcome to the San Gold HUB on AGORACOM

San Gold Corporation - one of Canada's most exciting new exploration companies and gold producers.

Free
Message: Re: AGM - comments on production
4
Jun 22, 2010 07:55PM
4
Jun 22, 2010 10:10PM

He mentioned the L13 zone is at level 16 at about 2200 ft, my notes don't mention why he believed this was significant to mention, sorry.

I can't say for sure, however if L13 intercepts the RLM at the 16 level at 2200 feet; and the 007 is suggested to be connected to the 98 vein and the RL East zone.

He commented on the 98 viens and the RL East veins at the 26 /28 levels that go up into the 007 zone

Then I would suggest that the hinge could possibly connect with the RLM about half way in between. If that is the case we could look forward to the eventual mining of the high grade hinge #6 lense from above the 26 level in the RLM while mining the same rich vein from the ramp at surface. If you look at the following PDF it appears there was past mining in that area of the mine.

http://www.sangoldcorp.com/i/pdf/2010Mar31-Map1.pdf

Share
New Message
Please login to post a reply