http://www.sangold.ca/i/pdf/20100422_RL_East_HighGrade.pdf
Drill hole #28-10-53 cut 121 g/tonne
(3.53 oz/ton) over 13.3 meters (44 ft) and included an extremely high grade segment of 319 g/tonne (9.30 oz/ton)
over 4.9 m (15.9 ft) containing coarse visible gold.
Remember when we felt/thought that management gave a sh@t about the shs. Well these results were hit after about 120 meters of drilling on April 22. That was about 5 months ago. lets say it is 200 meters from any workable surface and the hole was located only 4 months ago. 120 days for 200 meters or 1.7 meters/day. One would hope that they are capable of this even though our much touted infrastructure in antiquated and we have only been doing "developmental work"down there anyways. With all the results spewing forward one cannot help but wonder if the new core shacks are being utilized to store the "empties". I understand that the vendor won't take the returns if not in there original boxes. So best to keep them dry so we can get some ROI.
Without prejudice