..thinking about what"s happening at Rice Lake, we were told San had 20 stopes fully maned ready to go .Thinking out loud here then, we were also told the heavy development completed allows the heavy equipment to drive freely around the near surface mine. San running mining crews on 10 hr shifts could mine one stopping area in a two shift day. San could long hole a 12x12x 8 foot wd = 1152 cu ft divded 11.5 cubic ft = 100 tns. This would take 4 hrs and the blast would be set and triggerd at the end of shift with the next crew removing the ore and driving it back to a crusher. This 100 tns x .3 oz = 30 oz for one stope so x 20 stopes we should see 20 x 30 = 600 oz in a days work. Looking now that the development ore that was sitting at the mill should have been cleaned up by now , San should be producing near 600 oz if there are mining 8 ft wds in one 24 hr . Sans bulk samples tell us that .3 oz was milled so investors should see alot more oz then San told us. San mining 10 foot or 12 ft wds could either add to the oz if consistant grading or lower if the strip ratio increases. Either way this bulk sample area ( 007, emporer, hinge, cohibia, lio,ll13 should boost Sans Production up along with cost coming down because of the added oz and now development low grade is out of the way. PS San can Mill 1800 tns a day x .3 oz = 540 oz.x 80 days operation = 43000 oz in a qtr.Long On The Greens Traps7