Re: ..trading so-far To-Day
in response to
by
posted on
Jun 22, 2011 10:53AM
San Gold Corporation - one of Canada's most exciting new exploration companies and gold producers.
Del, the problem is in the way how misleading a 43-101 can be. Here we see from the last 43-101 that the 6 mill tons is a resource and not a reserve. A resouce is not mineable at this point and can become a reserve ( mineable ) after certain parameters are applied. Moving up the 6 mill tns to indicated reserve would give the 43 -101 ( current ) more clout to the market perception. .........
Total Inferred Resources 6,211,660 0.29 (9.9) 1,814,870
The mineral resources are in-situ, undiluted, and uncapped and have not had economic parameters applied to them. The 2009 bulk sample milling at Hinge recovered 16,052 ounces of gold. Assuming 93% mill recovery, 95% mine recovery, and 20% dilution the bulk sample equates to an in-situ resource of 45,000 tonnes grading 0.38 ounces per ton. This reconciles well with the average grade of the Hinge uncapped measured plus indicated resources. Further, monthly average grade fed to the mill (based on hourly mill belt samples) ranged from 0.25 to 0.64 ounces per ton, which indicates the variability of average grades over an area approximately 400 feet high by 700 feet along strike. Reconciliation of Company diluted, recoverable reserve estimates based on assay data, underground face samples, and mill belt samples indicate that the sampling and assaying protocols are providing good quality data. The Company monitors the QAQC information for the assaying process on a regular basis (standards and blanks sent to assay laboratories and the duplicates and replicates done by the laboratories). The Author has reviewed this information and found no serious discrepancies that had not been recognized and dealt with by the Company geologists. The mineral resources are defined in terms of NI 43-101 regulations and their estimation was carried out using industry standard polygonal longitudinal section methodology. The drill hole data was evaluated in plan and section in three dimensional AutoCAD to determine continuity between holes. Vein structures in the RLM area have vertical extents from 4 to 8 times their strike length. Because of this, areas of influence used around drill hole pierce points on the longitudinal section for purposes of defining measured and indicated resources are ellipses, elongate down dip. For measured resources an ellipse with short axis of 50 feet and long axis of 100 feet was used; for indicated resources an ellipse with short axis 75 feet and long axis 150 feet was used, and for drill inferred resources an ellipse with short axis of 100 feet and long axis of 225 feet was used. Additional inferred resources are based upon projection of measured plus indicated resources to a total depth of up to 4 times the strike length of the mineralized zone, provided that the zone is open at depth. A tonnage factor of 11.4 cubic feet per ton (equivalent to a specific gravity of 2.8) was used to convert polygon volumes to tons. The Company’s production department uses Amine software for reserve estimation and mine planning. Amine is a 3D AutoCAD based system that uses block modelling to determine reserve and resource estimates. The Author concludes that the data density and reliability of the drilling and sampling database is sufficient to complete an estimate of mineral resources for the Rice Lake Project. The Author has relied on data provided by qualified persons (as defined in NI 43-101) who are employees of the Company. In the Author’s opinion these qualified persons are competent and, other than errors or omissions that may inadvertently occur, have provided the Author with all of the data necessary to complete this Report................................. Rubicon 43-101 has simular situation were the tns are resources.. 1. Amended Inferred Mineral Resource Estimate Polygonal Model Inferred Mineral Resource Estimate - Uncapped and Capped
Inferred resources are too speculative to have economic consideration applied to them and there is no certainty that the inferred resources will be converted to measured and indicated resources. .........since the Market wants a 43-101 that has indicated /measured/. probable and proven reserves, mining companies knowing they have a elephant want time to prove it up and having resources instead of reservers allows one this time to drill . without prejudice. Traps7
Polygonal Model Inferred Mineral Resource Estimate
(5 g/t gold cut-off and 10 gram x metre product (core length) - surface to 1200 metres below surface)
Inferred Tonnes
Gold (Uncapped Grade)
10-5-2 oz Capped Gold Grade*
Inferred gold grade
(g/t)
Inferred
Ounces
Inferred gold grade
(g/t)
Inferred
Ounces
5,500,000
20.34
3,597,000
17.29
3,057,000