A couple of quickies
The long drifts will give them a much better look at the rock structure
The 007 vent raise was oversized at not too much added cost as it may be used as the start of a future shaft.
"A" shaft is to be shut down for about three months in the future to upsize the cables and hoisting capacity. This will give them the 3000tpd that Lunch was talking about.
Feels they now have most of the key ground under their control
They are very interested in some of the work on the wildcat properties