I believe Wynn Drilling only does the surface drilling, another drilling contractor (an independent) does the underground work. I think they should drill the shit out of level 16 and 26 under the 007 and Hinge zones and go get the gold into production.
I agree they should cut back as far as they can on the above ground, even postpone the WEL and Cou drilling. I assume they have spent all the flow through funding they got last year which is likely why they "had" to do above ground drilling.