32% increase in Measured & Indicated and 40% increase in Inferred
posted on
Mar 21, 2011 09:41AM
Toroparu Gold-Copper Deposit - 4.3 M Ounces Gold, 353 MM lbs By-Product Copper
TORONTO, ONTARIO--(Marketwire - March 21, 2011) - SANDSPRING RESOURCES LTD. (TSX VENTURE:SSP) ("Sandspring" or the "Company") is pleased to announce completion of an updated NI 43-101 compliant mineral resource estimate for the Toroparu gold-copper deposit in the Republic of Guyana, South America.
The latest mineral resource estimate for the Toroparu gold-copper deposit, independently modeled by P&E Mining Consultants Inc. ("P&E"), Toronto as a potentially open-pittable deposit within a single optimized open pit shell at an economic cutoff grade of 0.24g/t gold-equivalent (AuEq) contains the following mineral resource classification:
Highlights include:
Abraham Drost, P.Geo. President of Sandspring states: "The latest NI 43-101 compliant Mineral Resource update for Sandspring's Toroparu gold-copper deposit caps a year of incredible resource growth performance.
Presentation of the optimized pit sensitivity at cutoff constrained to 0.42g/t AuEq the same as the last resource update on September 15, 2010 in Table 2 is intended to show the organic growth of approximately 800,000 oz gold Indicated and 600,000 oz gold Inferred defined within in the deposit since the last resource update. Higher two-year trailing average metal prices and more accurate processing & G&A costs in the current optimized pit mineral resource (Table 1) added additional gold and copper at the lower economic cut-off.
The newest single open pit optimized resource model is still open to depth and along strike. Considerable growth potential remains in the immediate resource area and within prospective target areas that Sandspring is actively exploring within its larger Upper Puruni concessions.
The updated mineral resource forms the basis for an NI 43-101 compliant Preliminary Economic Assessment including preliminary mine plan and pro-forma cash flow model that the Company and P&E Mining Consultants Inc. are preparing for the Toroparu deposit".
Table 1: Toroparu Optimized Pit Resource Estimate at 0.24 g/t AuEq Cut-Off Grade (1)(2)(3)(4) | |||||||
Classification | Tonnes (000's) |
Au (g/t) | Cu (%) |
AuEq (g/t) |
Au oz (000's) |
Cu lb (millions) |
AuEq oz (000's) |
Saprolite | |||||||
Measured | 1,021 | 0.96 | 0.05 | 0.96 | 31.5 | 1.2 | 31.5 |
Indicated | 2,747 | 0.68 | 0.05 | 0.68 | 60.1 | 3.0 | 60.1 |
Measured & Indicated | 3,768 | 0.76 | 0.05 | 0.76 | 91.6 | 4.2 | 91.6 |
Inferred | 5,473 | 0.85 | 0.04 | 0.85 | 149.6 | 4.8 | 149.6 |
Fresh Rock | |||||||
Measured | 28,635 | 0.88 | 0.14 | 1.12 | 810.2 | 88.4 | 1,031.1 |
Indicated | 119,466 | 0.68 | 0.09 | 0.84 | 2,611.8 | 237.0 | 3,226.4 |
Measured & Indicated | 148,101 | 0.72 | 0.10 | 0.89 | 3,422.0 | 325.4 | 4,257.5 |
Inferred | 209,365 | 0.71 | 0.05 | 0.80 | 4,779.2 | 230.8 | 5,385.0 |
Total | |||||||
Measured | 29,656 | 0.88 | 0.14 | 1.11 | 841.7 | 89.6 | 1,062.6 |
Indicated | 122,213 | 0.68 | 0.09 | 0.84 | 2,671.9 | 240.0 | 3,286.5 |
Measured & Indicated | 151,869 | 0.72 | 0.10 | 0.89 | 3,513.6 | 329.6 | 4,349.1 |
Inferred | 214,838 | 0.71 | 0.05 | 0.80 | 4,928.7 | 235.6 | 5,534.6 |
(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues and are subject to the findings of a full feasibility study. |
(2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred resources as an Indicated or Measured mineral resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category. |
(3) The mineral resources in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council. |
(4) The metal prices used in this estimate were a February 28, 2011 two-year trailing average as follows: Au US$1,137/oz, Cu $3.13/lb, Au : Cu ratio using 93% Au recovery and 80% Cu recovery was 1.62 Cu to Au. Mining costs were $1.28 per tonne of fresh rock and .87 per tonne of Saprolite, Processing and G&A costs were $8.16/tonne. Pit optimization slopes were 50 degrees. |
Table 2: Optimized Pit Sensitivity at 0.42 g/t AuEq Comparison Cut-Off Grade | |||||||
Classification | Tonnes | Au | Cu | AuEq | Au oz | Cu lb | AuEq oz |
(000's) | (g/t) | (%) | (g/t) | (000's) | (millions) | (000's) | |
Saprolite | |||||||
Measured | 832 | 1.11 | 0.04 | 1.11 | 29.6 | 0.8 | 29.6 |
Indicated | 1,817 | 0.86 | 0.06 | 0.86 | 50.5 | 2.4 | 50.5 |
Measured & Indicated | 2,649 | 0.94 | 0.05 | 0.94 | 80.1 | 3.2 | 80.1 |
Inferred | 3,893 | 1.06 | 0.05 | 1.06 | 132.8 | 4.1 | 132.8 |
Fresh Rock | |||||||
Measured | 24,410 | 0.99 | 0.16 | 1.26 | 777.7 | 85.6 | 985.7 |
Indicated | 87,542 | 0.85 | 0.10 | 1.02 | 2,378.3 | 200.7 | 2,865.2 |
Measured & Indicated | 111,952 | 0.88 | 0.12 | 1.07 | 3,156.0 | 286.3 | 3,850.9 |
Inferred | 145,645 | 0.87 | 0.06 | 0.97 | 4,078.6 | 195.9 | 4,551.5 |
Total | |||||||
Measured | 25,242 | 0.99 | 0.16 | 1.25 | 807.3 | 86.4 | 1,015.3 |
Indicated | 89,359 | 0.85 | 0.10 | 1.01 | 2,428.8 | 203.1 | 2,915.7 |
Measured & Indicated | 114,601 | 0.88 | 0.11 | 1.07 | 3,236.1 | 289.4 | 3,931.0 |
Inferred | 149,539 | 0.88 | 0.06 | 0.97 | 4,211.4 | 200.0 | 4,684.3 |
Table 3: Global (In and Out-of Pit) Mineral Inventory Sensitivity at 0.24g/t AuEq Cut-Off | |||||||
Classification | Tonnes | Au | Cu | AuEq | Au oz | Cu lb | AuEq oz |
(000's) | (g/t) | (%) | (g/t) | (000's) | (millions) | (000's) | |
Saprolite | 1,065 | 0.97 | 0.05 | 0.97 | 33.2 | 1.1 | 33.2 |
Measured | 2,823 | 0.69 | 0.05 | 0.69 | 62.3 | 3.2 | 62.3 |
Indicated | 3,888 | 0.76 | 0.05 | 0.76 | 95.5 | 4.2 | 95.5 |
Measured & Indicated | 5,575 | 0.85 | 0.04 | 0.85 | 151.8 | 5.4 | 151.8 |
Inferred | 1,065 | 0.97 | 0.05 | 0.97 | 33.2 | 1.1 | 33.2 |
Fresh Rock | |||||||
Measured | 28,635 | 0.88 | 0.14 | 1.12 | 810.2 | 90.9 | 1,031.1 |
Indicated | 119,666 | 0.68 | 0.09 | 0.84 | 2,631.6 | 237.4 | 3,212.6 |
Measured & Indicated | 148,302 | 0.72 | 0.10 | 0.89 | 3,441.8 | 328.3 | 4,243.7 |
Inferred | 228,112 | 0.71 | 0.05 | 0.79 | 5,177.8 | 256.5 | 5,801.2 |
Total | |||||||
Measured | 29,700 | 0.88 | 0.14 | 1.11 | 843.4 | 92.0 | 1,064.3 |
Indicated | 122,490 | 0.68 | 0.09 | 0.83 | 2,693.9 | 240.6 | 3,274.8 |
Measured & Indicated | 152,190 | 0.72 | 0.10 | 0.89 | 3,537.2 | 332.6 | 4,339.1 |
Inferred | 233,687 | 0.71 | 0.05 | 0.79 | 5,329.6 | 261.9 | 5,953.0 |
The original Toroparu mineral resource estimate (October 26, 2008) was calculated from deposit-specific mineralized intercepts in 29 NQ diamond drill holes, totaling 9,493 metres and by 16 mineralized trenches. The June, 2010 mineral resource update was calculated from deposit-specific mineralized intercepts from an additional 36 NQ diamond drill holes (TPD-30 to TPD-66) totaling 17,604 metres. The Sept, 2010 mineral resource update was calculated from deposit-specific mineralized intercepts from an additional 27 NQ diamond drill holes (TPD-67 to TPD-93) totaling 14,562 metres. The current mineral resource estimate was calculated from deposit-specific mineralized intercepts extracted from an additional 35 NQ diamond drill holes (TPD-94 to TPD-128) totaling 21,706 metres, for a total of 63,365 metres, designed to expand and optimize grade and tonnage parameters of the known NI 43-101 compliant Toroparu gold-copper resource. Mineralization is still open in all directions.
Analytical testing and reporting of quantitative assays for holes TPD-51 to TPD-128 was performed independently by Acme Analytical Laboratories Ltd. (AcmeLabs) with sample preparation facilities in Georgetown, Guyana and analytical facilities in Santiago, Chile and Vancouver, Canada with its head office based in Vancouver, Canada. AcmeLabs is an ISO9001:2008 accredited laboratory for the tests reported herein. Analytical testing and reporting of quantitative assays for holes TPD-030 to TPD-050 was performed independently by Activation Laboratories (ActLabs), an ISO accredited sample preparation facility in Georgetown, Guyana and an analytical facility in Caracas, Venezuela with its head office based in Toronto, Ontario.