Re: SMH drill results
in response to
by
posted on
Apr 14, 2010 02:21PM
Yes. I am shareholder of Smh ,but work for another exploration co.
1 depends on depth of hole as to how long it takes.on average 40 metres a day
2 P.Geo must log-identify rock and what to assay
3 core must be cut in half,tagged bagged with blanks put in
Smh was 100 miles north of Red lake they are not going to run a few samples down to Red Lake .They would go when a truck is going back.Sometimes the P.Geo will not cut the core in this case because it is the 1st time it has been drilled;he may want a few holes to compare the rock.
4 If they used the Assay lab in Red lake;It would be prepared there and then shipped to the lab. that would do the assay which could be different places ie: Full Spectrum,Uranium,Moly maybe one place then it goes elsewhere to do silver ,Gold,etc. three places same company
5 Last ,but not least 21 to 28 days right now to get assays
6 small program you are going to put all the info out at the same time 100,000 metres every 4 to 8 holes