"The Company believes that the 60 gpt Ag Eq portion of the deposit with an estimated tonnage of 27.9 million tonnes grading 112 grams per tonne Ag Eq* constitutes a priority area to be examined as a potential "Starter Pit" for initial conceptual operations that will be examined in the Preliminary Economic Assessment (PEA) to be commenced shortly."
That is an excellent resource base. The cost of extraction should be low. I'm hanging on to this one.