Welcome to the Silver Falcon Mining HUB on AGORACOM

(Edit this Message from the "Fast Facts" Section)

Free
Message: 400 tons/ shift milling

400 tons/ shift milling

posted on Oct 19, 2009 04:57PM

I talked with YI today about how many tons the mill equipment can process per shift. I heard comments similar to what others on this board have posted before. The mill equipment as it will be set up will be able to process 400 dry tons of ROM in one 10 hr. shift. The mill will start out processing 30 t/day as this early phase is to find the exact right settings to maximize AU and Ag returns. When the best parameters have been found, tonnage processed/ 10 hr. shift will go to 400 t/ shift. Two shifts/day (800 t processed/day) may be used when production is fully established.

The 5.1 g/t Au will be the lowest figures we get from the tailings, and PR of high Au and Ag/t already assayed from tailings will be released after the listing is completed , and the mill is up and operating.

Share
New Message
Please login to post a reply