From another convo with YI (with Imperial Wazoo, another poster on i hub). Clarity would be good here. I'll try to make the call today.

On the web cam, in the middle of the picture, is a flat rectangular foundation. The mill site goes there. He said the concrete has been poured already & is set and cured completely. The flat area is it. It is covers with a tarp at present. He said to look for the steel of the pre-fab building to get bolted together soon. Yesterday, you could see the lower walls getting prepered. The workers assembled the carpentry framing

to pour the loewer wall concrete into. The foundation is already poured.