I'm confused about the 43-101. How can we get it done without drilling? Seems to me we need extensive drilling before filing a completed 43 101. I do believe that sfmi was trying to retrieve some documentation on the WEM (from the previous ownwers maybe). Is there some what that historical documentation can be used (even partially) for the 43 101?
In short I am skeptical that we can have the 43 101 completed before drilling. Hope I am wrong!