quote
processed tailings on site and will result in a reduction in the quantity of the material to be leached by a factor of ten. In other words, at the end of the process, SFMI will have a quantity of 3,000 tons of high grade concentrate ready for the closed-circuit leaching process. Management remains confident in getting this closed-circuit leach processing permit within a reasonable time-frame
3000 tons of concentrate = 3000 tims 40gr p ton =120.000 gr :30=4000oz gold =$6.600.000
it is all in black and white do DD