I think they ran the mill to the best of their ability but when it didn't produce good results the end deduction ment perhaps no one could extract the PM from the tailings without a leach system leaving the mountains of tailings almost worthless to this company. Then a wait for drilling to show reserves. I suggest a huge drill into the visable gold vein in the Sinker, then mill the ore from the drilling. A drill 6ft in diameter should do it. Just a matter of time, this is going to fly.
Red