Building Silver Resources in Mexico

200 million plus oz of Silver and 1 million plus oz Gold Resource

Free
Message: Silvermex Resources Starts Drilling at La Guitarra

Silvermex Resources Starts Drilling at La Guitarra

Vancouver, BC, Canada -- April 19, 2011 -- Silvermex Resources Inc. ("Silvermex") (TSX: SLX) announces the commencement of a program of underground delineation and exploration drilling at its La Guitarra Mine in the Temascaltepec Mining District, Mexico State, Mexico. The diamond drill contractor has mobilized on site. The present program will consist of approximately 7,500 m of NQ core drilling.

The objective of the delineation drilling is to upgrade known resources to a reserve category, and to evaluate down dip and lateral extensions of existing ore chutes. The exploration drilling will concentrate on identifying new resources within the mine area. The new mine geological team on site has focused on identifying the key structural controls for the La Guitarra mineralization and is confident that the current drill program will be successful in identifying additional mineralization.

Drilling will focus on two different areas of the mine. Exploration drilling will concentrate on the central part of the mine where there is a major flexure in the structure with increased dilatancy. Historically, these dilatant zones have given better widths and grades of mineralization but have not been effectively used to locate new resources. Similar structural flexures have been identified along strike and down dip and will be the subject of future exploration programs.

The second area of focus is the San Rafael zone, along the southeast extension of the La Guitarra structure. This area has recently been dewatered and several crosscuts and drill stations have been prepared. This phase of drilling will aim to upgrade the known mineralization from an indicated resource to a reserve category, which will enable proper mine planning and resource extraction. Several holes will be drilled to test potential down plunge continuity to the mineralization.

The entire program is expected to take approximately three to four months to complete. A new QA/QC program has been initiated to improve and ensure the accuracy and reliability of the drill results. Controls include the insertion of appropriate standards, blanks and duplicate samples. Additionally, approximately 5% of the original samples will have a second split submitted to a second outside laboratory for check assaying. Assay results will be released periodically throughout the drill program.

The data disclosed in this news release have been reviewed and verified by Company Vice President of Exploration Robert Fraser, M.Sc., P.Geo. and Qualified Person as defined by National Instrument 43-101.


Company Profile

Silvermex Resources Inc. is a publicly traded mining company focused in Mexico and led by a highly qualified team of professionals from some of the most notable companies in the silver mining sector. The Company's portfolio of projects ranges from advanced stage exploration to production. Its core asset is the producing La Guitarra silver-gold mine located in the Temascaltepec Mining District of Mexico. Silvermex is currently working to increase production at the mine to full capacity and is conducting extensive exploration to further develop the district. Silvermex is well financed to further develop resources organically from its multiple projects as well as from the acquisition of additional assets that will drive production growth.


ON BEHALF OF THE BOARD
"Duane Nelson"

Duane Nelson
CEO & Director
Share
New Message
Please login to post a reply