2nd quarter results
posted on
Aug 10, 2011 09:30PM
SSO on the TSX, SSRI on the NASDAQ
it looks like they have finally gotten pirquitas on track. costs are higher than i would have liked, but with higher revenues come higher royalties too:
The Pirquitas mine produced 2.0 million ounces of silver during the second quarter of 2011 compared with 1.7 million ounces in the first quarter of 2011 and 1.7 million ounces in the second quarter of 2010. The increased production in the quarter as compared to the first quarter was a result of production efficiencies implemented earlier in 2011.
During the second quarter of 2011, 295,004 tonnes of ore were processed at an average milling rate of 3,241 tonnes per day, compared to 307,745 tonnes at an average of 3,419 tonnes per day achieved in the first quarter of 2011 and 345,661 tonnes at an average milling rate of 3,798 tonnes per day in the second quarter of 2010. The reduced tonnage processed during the second quarter of 2011 resulted from a 13-day ball mill shutdown to refurbish the gearbox. Additional repairs and maintenance in July 2011 resulted in a further 17 days of downtime.
The mine continues to process sulphide ore and the metallurgical response and overall silver recovery rates are in line with feasibility study expectations. The ore produced during the second quarter of 2011 contained silver head grades of 261 grams/tonne and achieved recoveries of 80%, compared to silver head grades of 233 grams/tonne and recoveries of 74% in the first quarter of 2011 and silver head grades of 240 grams/tonne and recoveries of 64% in the second quarter of 2010. The higher recovery achieved during the second quarter was due principally to consistent feed and continuous improvements to the crushing and flotation circuits.
The mine produced a total of 2.8 million pounds of zinc in the second quarter of 2011 compared to 3.2 million pounds in the first quarter of 2011. The reduction in zinc production is primarily due to a lower grade being processed.
Test work of the tin circuit continues, with the objective of improving the tin recovery while maintaining a satisfactory final concentrate tin grade. Preliminary results of this test work are expected later in 2011.
http://ir.silverstandard.com/releasedetail.cfm?ReleaseID=598529