From Bundtzen's report:
"There is a generator (diesel) on site and backup units at the company facility on Ester Dome in Fairbanks. Rather than speculating whether these units can power the mill, the QP has recommended that Silverado buys a new unit."
From Page 136, Itemized Capital Cost:
Infrastructure 1.4 Mw Generator (Westingshouse) $400,000