Message: HIGHLIGHTS of Silverado's Nolan Creek Project Update - April 2010

You have to scroll to right to see all of the data, and the table may have formatting reproduction problems, but here goes...bottom line $207MM gross including all catagories...Probable is the most important and it is $124.3MM...tip of the Nolan Mineralburg, literally.

Reserve Category Quantity Ore (tons) % Sb Metal (tons Sb) @95% Recovery Value/Ton Sb Grade (Toz Au/ton) Metal (Toz Au) @ 90% Recovery Value/Toz Au Total Value Sb Total Value Au Grand Total Gross Value Mining Days @250 tpd Net Value @ 60% Value per Share (@1.9B Shares) Potential SP @ P/E =15
1/7/2010, Probable 42,412.0 28.00% 11281.6 $9,500 0.408 15573.7 $1,100 $107,175,124 $17,131,055 $124,306,179 170 $74,583,707 $0.039 $0.59
1/7/2010, Indicated 12,039.0 20.02% 2289.7 $9,500 0.236 2557.1 $1,100 $21,752,125 $2,812,792 $24,564,917 48 $14,738,950 $0.008 $0.12
1/7/2010, Inferred 34,206.0 14.92% 4848.4 $9,500 0.357 10990.4 $1,100 $46,059,405 $12,089,427 $58,148,832 137 $34,889,299 $0.018 $0.28
Total Jan, 2010 88,657.0 18,419.6 0.33 29,121.2 $174,986,655 $32,033,274 $207,019,928 355 $124,211,957 $0.065 $0.98