I called Snowfield today and I was told that the SRC is working on the re-processing right now. The results could be 1 or 2 weeks away. Hopefully, the SRC has slotted us in before the Gahcho job.
Out of interest, does anyone know if the SRC can only work on one batch at a time?
A drill rig is being moved up to the Wire Claims property while it is still frozen. Apparently, there are some interesting targets up there.
All the best,
Peterjr
PS: Carefully read pure1's recent posts on the Bullboard. One of them has a pretty encouraging hint at something else that may be going on.