Re: ...Getting Closer
in response to
by
posted on
Apr 20, 2009 06:40PM
Focused on the Rice Lake Gold Belt
..sorry about my posting skills, but the drift of my last post, was to,, show just how close Marum is, to the action. News of drilling will sure arouse Winkin, Blinkin and Nod,,,,remember, the Pluton still has not been found, The claims were explored and developed by a syndicate. A shaft on Syndicate No. 9 was begun in 1926 and 1927. In 1935 this shaft was deepened and expanded until it reached a depth of 148 m. In 1932 Vanson Gold Mines Limited was formed and took control of Syndicate No. 9 and 10, along with several other claims. A 23 tonne capacity mill was installed in 1933. This mill proved unsatisfactory and was replaced by a 2-stamp mill with a capacity of about 16.3 tonnes per day. Newspaper reports mention the ore was running $11 per tonne and some gold was produced (Manitoba Mines Branch). Some trenching was done on other Syndicate claims. Spectacular high grade ore was reported in 1932 and 1934 (Manitoba Mines Branch, Company Report 1932). Early in 1934 Vanson Manitoba Gold Mines Limited took control of Vanson Gold Mines Limited....keeping my finger crossed. Traps7