1. Will the mine design include ways to offset the high cost of energy, whether electrical or diesel? For example, would TDC consider installing a wind turbine?
2. If there is lots of Sulphur contained in Pyrrite in the ore, could there be an offset in selling H2SO4, as Yamana Gold plans to do?
3. How large will the workforce need to be, and what skill sets would these employees need?
4. Are there any discussions with any majors at this stage? If not, at what stage would that begin to occur?
5. Is it correct to assume that inferred resources very deep under those identified so far can not be dilineated until the mine is in production, as drillling deeper than a few hundred meters is not practical? If so, why not extend a shaft from the Discover shafts at depth, and explore from depth into the material 1500 feet below Ormsby?