The generally warm conditions lately have not stopped the Ice road. With 36" in all segments of the ice road, we can be sure that the smaller ice road for Tyhee is also in good condition, however I don't have any reports on it.
Would be nice to see some update on Tyhee's web site on this.
There is this one new picture of a helicopter moving a drill rig, as of 7 Feb
http://www.tyhee.com/photographs/images/GSHatOrmsby1.JPG
Looks like two Connors drill rigs being mobilized from the Ormsby camp. Consistent with the last press release.
With the milder temps not hindering the ice road, I imagine that drilling will go very well as it's a lot easier to work in minus 12 than minus 40!
Good luck on the drilling, hope to see some nice results in the next 2 or 3 months.