Welcome To The Typhoon Exploration Inc.HUB On AGORACOM

Mining exploration company

Free
Message: Typhoon: Successful Drill Campaign at Fayolle

Typhoon: Successful Drill Campaign at Fayolle

posted on Nov 11, 2008 11:56AM
TYPHOON EXPLORATION INC.

TSX VENTURE: TOO
Nov 06, 2008 10:28 ET

Typhoon: Successful Drill Campaign at Fayolle

LAVAL, CANADA--(Marketwire - Nov. 6, 2008) - Typhoon Exploration Inc. (TSX VENTURE:TOO) is proud to present the results of its winter 2008 campaign. Nineteen drill holes (19), totalling 7,589 meters, were realised on the Fayolle property owned 100% by Typhoon. (See map at the following address: http://media3.marketwire.com/docs/TO... ).

The drill holes FA-07-28 to FA-08-08, FA-08-10, FA-08-13 and FA-08-16 were realised in the central and the west to northwest areas of the Fayolle deposit. They were initiated in order to verify the west lateral extensions as well as the vertical depth of the mineralized envelopes of the Fayolle deposit.

These drilling confirmed the mineralization geology and demonstrated that it is possible to find extensions with significant gold averages such as:


------------------------------------...
#DDH From To Length Average
(m) (m) (m) Au (g/t)
------------------------------------...
FA-08-03 211 214 3 1,24
------------------------------------...
FA-08-13 147 166 19 10,84
------------------------------------...

Drill holes FA-08-09, FA-08-11, FA-08-12, FA-08-14, FA-08-15, FA-08-17 and FA-08-19 were completed in the east area at more than 450 meters (1 480 feet) east of the Fayolle deposit.

These drillings confirmed the presence of very significant gold mineralization defining the presence of a new showing "Mc Donald showing" with gold intersection averages such as:


------------------------------------...
#DDH From To Length Average
(m) (m) (m) Au (g/t)
------------------------------------...
FA-08-09 134 140 6 1,45
------------------------------------...
FA-08-11 34,4 39 4,6 3,59
------------------------------------...
FA-08-14 209 214 5 1,65
------------------------------------...
FA-08-15 227 234 7 4,26
------------------------------------...
FA-08-17 122 143 21 3,91
------------------------------------...
FA-08-19 21 42 21 1,74
------------------------------------...


Lengths are measured along the core axis and they may be less than the core lengths reported.

Mr. Robert Gagnon, P. Geo., Technical Advisor, a Qualified Person as defined by National Instrument 43-101, supervised the preparation of the information in this news release.

The common shares of Typhoon Exploration are listed on the Venture Stock Exchange under the symbol "TOO".

Statements in this release that are not historical facts are "forward-looking statements" within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Readers are cautioned that any such statements are not guarantees of future performance, and that actual developments or results may vary materially from those in these "forward-looking statements". The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.





For more information, please contact

Typhoon Exploration Inc.
David Mc Donald, CEO
450-622-4066
Toll-free: 1-877-622-4004
info@explorationtyphon.com
Share
New Message
Please login to post a reply