Interesting tidbit Joe. I don't think the VMS boys are goign to allow the same thing to happen LOL!
RD-08-36: 81.10m (266.08 ft) of Near Solid Sulphide in 9 separate intervals ....
....well, not 100m but close enough - damn huge! Looks like your rumor was pretty close Bigguns. Props.
Two of the drills remain on site and will commence drilling following a brief shutdown period for the winter/spring breakup. It is anticipated that both drills will be drilling the deposit and a third drill is to be employed to test other anomalies in the vicinity of the 'Tower Zone' approximately 1.0km to the east.
Seems like all is well on the drilling front though.