Copper-zinc exploration in the Flin Flon-Snow Lake VMS Belt

Recent Results Include 6.69% Copper Over 71.69 Metres and 3.74% Copper Over 21.77 Metres

Free
Message: follow up, cause i missed edit time..

if you take the 288$ per ton(80% recovery, 4.5$ copper, 4%cu-eq)

and you use the highend operating cost of chisel north (100$)

you come out with 188$ per ton... multiply by 4 million tons.. (30% of that) is 225.6 million..

just to think about lol

Share
New Message
Please login to post a reply