Looks like the expectations were high ;) 550 bpd+0.8mmcfpd, at the moment. then the other section produced about the same amount pd (400/0.52). why the MC has been cut in half, is not really a measured response, but understandable.
possible good things, no water production?
active hc system...
targeting other parts of the field which might have more natural fractures...? further drilling...
40 mln MC, with still such a large permit. still seems interesting