TORONTO, Feb. 21, 2012 /CNW/ - Volta Resources Inc. ("Volta Resources" or the "Company") (TSX: VTR) announces the results from an additional seventeen drill holes from its on-going Phase 3 program at its Kiaka Gold Project in Burkina Faso. Phase 3 comprises approximately 50,000m of drilling being undertaken to extend resources in the Central Area, to follow up positive results in the South Area, to test several more ground geophysical targets and undertake scout drilling on regional targets on the Kiaka property (see News Release of 13 October 2011).
The seventeen reported holes were drilled in the northern and central parts of the Kiaka Main Zone (KMZ) orebody. They aimed at extending the resources in the Central Zone, both at depth and to the North, at testing the Hanging Wall and Footwall Zones and at allowing for a better defintion of the orebody.
The 17 holes, comprising a total of 5,248m, confirm the continuity of wide mineralization, typical of the KMZ deposit, at depth and to the North and also show the continuity of the Hanging Wall Zone (KHZ) at depth. Holes KDH317 and KDH320 intersected mineralization down to a vertical depth exceeding 500m. The holes on sections 5800N to 6050N confirm the continuity of mineralization to the North. The mineralization was, however, interesected above the "southeasterly striking fault" (see News Release of 16 January 2012) which off-sets the wide mineralization, typical of the Kiaka Main Zone (KMZ), from the hanging wall style (" KHZ"). The southeasterly striking fault dips moderately to the northwest and the holes reported in this news release intersected multiple parallel hanging wall style mineralized zones ranging in width from several metres to about 30 metres.
The highlights from the reported drill holes include :
Kevin Bullock, Volta Resources' CEO, said, "Since the Central Area in the KMZ is the heart of the Kiaka deposit we are very happy to keep recording results that will continue to improve the project's dynamics. These results, along with other recent results, are being used in the upcoming resource update and Pre-Feasibility Study."
Results for the holes are highlighted in Table 1 and in locations shown in Figure 1. Analyses of the Volta Resources samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories in Ouagadougou. Volta Resources' sampling and assay procedures included rigorous QA/QC elements that employed the inclusion of certified standards and blanks.
Table 1: Highlights of gold intersections for the reported boreholes
SECTION | BHID | FROM | TO | INTERVAL | Au | COMMENTS |
(m) | (m) | (m) | (g/t) | |||
5575N | KDH323 | 153.00 | 156.00 | 3.00 | 1.19 | |
AND | 161.30 | 187.20 | 25.90 | 0.72 | ||
INCL | 173.00 | 180.00 | 7.00 | 1.56 | ||
AND | 258.00 | 279.10 | 21.10 | 0.88 | ||
INCL | 265.00 | 271.00 | 6.00 | 1.70 | ||
AND | 361.00 | 449.90 | 88.90 | 0.62 | ||
INCL | 413.00 | 417.00 | 4.00 | 1.62 | ||
INCL | 435.00 | 442.00 | 7.00 | 2.00 | ||
INCL | 446.40 | 449.90 | 3.50 | 2.62 | ||
AND | 455.00 | 524.00 | 69.00 | 0.95 | ||
INCL | 461.00 | 475.30 | 14.30 | 1.32 | ||
INCL | 505.30 | 519.35 | 14.05 | 1.85 | ||
AND | 530.00 | 603.00 | 73.00 | 0.56 | ||
INCL | 536.00 | 540.70 | 4.70 | 2.24 | ||
INCL | 547.70 | 552.00 | 4.30 | 1.02 | ||
INCL | 581.00 | 584.00 | 3.00 | 1.42 | ||
5625N | KDH321 | 122.00 | 161.00 | 39.00 | 0.93 | 138.0-139.0m = 17.1g/t Au |
AND | 181.00 | 188.00 | 7.00 | 14.60 | 182.0-183.0m = 30.2g/t Au; 183.0-184.0m = 69.7g/t Au | |
AND | 226.00 | 235.90 | 9.90 | 1.27 | ||
INCL. | 226.00 | 229.00 | 3.00 | 3.19 | ||
AND | 289.00 | 348.00 | 59.00 | 1.36 | ||
INCL. | 304.00 | 307.00 | 3.00 | 1.90 | ||
INCL. | 310.00 | 338.00 | 28.00 | 1.97 | ||
AND | 409.00 | 429.50 | 20.50 | 0.74 | ||
AND | 444.00 | 483.00 | 39.00 | 0.59 | ||
INCL. | 461.00 | 464.00 | 3.00 | 1.13 | ||
5650N | KDH318 | 175.70 | 179.00 | 3.30 | 1.25 | |
AND | 187.00 | 199.75 | 12.75 | 0.84 | ||
INCL | 187.00 | 191.00 | 4.00 | 1.10 | ||
INCL | 194.00 | 198.00 | 4.00 | 1.25 | ||
AND | 319.00 | 347.00 | 28.00 | 0.74 | ||
INCL | 330.00 | 335.80 | 5.80 | 1.98 | ||
5675N | KDH317 | 93.00 | 121.00 | 28.00 | 0.56 | |
AND | 214.00 | 227.00 | 13.00 | 1.14 | ||
INCL | 219.00 | 227.00 | 8.00 | 1.71 | ||
AND | 241.00 | 267.00 | 26.00 | 0.56 | ||
INCL | 252.75 | 256.00 | 3.25 | 1.41 | ||
INCL | 261.00 | 266.00 | 5.00 | 1.00 | ||
AND | 352.00 | 455.00 | 103.00 | 0.63 | ||
INCL | 358.00 | 365.00 | 7.00 | 1.10 | ||
INCL | 414.00 | 424.00 | 10.00 | 1.18 | ||
AND | 465.00 | 628.00 | 163.00 | 0.94 | 481.0 - 482.0 = 25.50g/t | |
INCL | 473.00 | 489.00 | 16.00 | 2.39 | ||
INCL | 494.00 | 510.00 | 16.00 | 1.34 | ||
INCL | 521.00 | 529.00 | 8.00 | 1.73 | ||
INCL | 532.00 | 539.00 | 7.00 | 1.97 | ||
INCL | 542.00 | 562.00 | 20.00 | 1.31 | ||
INCL | 568.00 | 576.00 | 8.00 | 1.17 | ||
AND | 662.00 | 678.00 | 16.00 | 0.55 | ||
5700N | KDH316 | 122.25 | 144.00 | 21.75 | 1.99 | 127.00 - 128.00 = 26.10g/t |
INCL | 125.30 | 138.00 | 12.70 | 3.04 | ||
AND | 338.60 | 399.00 | 60.40 | 0.63 | ||
INCL | 352.00 | 362.00 | 10.00 | 1.11 | ||
AND | 405.60 | 463.00 | 57.40 | 1.10 | ||
INCL | 410.00 | 414.00 | 4.00 | 1.02 | ||
INCL | 419.00 | 424.00 | 5.00 | 1.29 | ||
INCL | 431.00 | 452.75 | 21.75 | 1.59 | ||
INCL | 459.00 | 463.00 | 4.00 | 2.21 | ||
AND | 472.00 | 592.70 | 120.70 | 0.97 | ||
INCL | 473.00 | 481.00 | 8.00 | 1.39 | ||
INCL | 485.10 | 495.30 | 10.20 | 1.28 | ||
INCL | 503.00 | 531.00 | 28.00 | 1.30 | ||
INCL | 538.00 | 543.47 | 5.47 | 1.27 | ||
INCL | 549.00 | 557.00 | 8.00 | 1.05 | ||
INCL | 560.00 | 578.00 | 18.00 | 1.07 | ||
5800N | KDH305 | 157.00 | 161.00 | 4.00 | 1.22 | |
AND | 173.00 | 181.00 | 8.00 | 1.83 | 180.00 - 181.00 = 12.75g/t | |
5950N | KDH309 | 217.90 | 225.00 | 7.10 | 1.61 | |
INCL | 217.90 | 221.00 | 3.10 | 3.39 | ||
AND | 232.00 | 235.40 | 3.40 | 1.05 | ||
AND | 269.70 | 280.10 | 10.40 | 0.50 | ||
AND | 316.00 | 319.00 | 3.00 | 1.33 | ||
AND | 363.90 | 371.00 | 7.10 | 0.96 | ||
KDH310 | 54.00 | 57.00 | 3.00 | 27.30 | 54.0 - 55.0 = 78.80g/t | |
AND | 90.00 | 93.00 | 3.00 | 1.37 | ||
KDH313 | 209.70 | 220.00 | 10.30 | 1.00 | ||
KDH315 | 54.00 | 60.10 | 6.10 | 3.12 | ||
AND | 115.00 | 125.00 | 10.00 | 0.85 | ||
6000N | KDH298 | 109.00 | 131.40 | 22.40 | 0.66 | |
INCL | 119.00 | 123.00 | 4.00 | 2.21 | ||
AND | 174.00 | 177.00 | 3.00 | 1.26 | ||
AND | 231.00 | 250.70 | 19.70 | 0.75 | ||
AND | 280.00 | 301.11 | 21.11 | 0.56 | ENDED IN MINERALIZATION | |
KDH311 | 253.00 | 265.00 | 12.00 | 2.28 | 256.00 - 257.00 = 11.70g/t | |
INCL | 257.00 | 261.00 | 4.00 | 4.26 | ||
AND | 274.50 | 278.45 | 3.95 | 1.61 | ||
AND | 291.00 | 319.00 | 28.00 | 0.62 | ||
INCL | 292.00 | 296.00 | 4.00 | 1.80 | ||
AND | 406.00 | 445.75 | 39.75 | 0.78 | ||
INCL | 436.85 | 445.75 | 8.90 | 1.45 | ||
AND | 457.30 | 460.70 | 3.40 | 1.26 | ||
KDH314 | 106.00 | 117.10 | 11.10 | 1.52 | ||
INCL | 112.30 | 117.10 | 4.80 | 2.82 | ||
6050N | KDH312 | 371.20 | 383.00 | 11.80 | 0.78 | |
INCL | 379.10 | 383.00 | 3.90 | 1.38 | ||
AND | 433.90 | 446.35 | 12.45 | 0.61 | ||
AND | 454.40 | 487.00 | 32.60 | 0.76 | ||
INCL | 466.40 | 469.15 | 2.75 | 1.14 | ||
KDH319 | 98.00 | 120.00 | 22.00 | 0.56 | ||
INCL | 102.00 | 105.00 | 3.00 | 1.82 |
Notes on Table 1:
TABLE 2 : Collar coordinates and orientation parameters for the reported boreholes
SECTION | Hole ID | Easting | Northing | Elevation | Depth | Dip | Azimuth |
(m) | (m) | (degrees) | (degrees) | ||||
5575N | KDH323 | 739295.56 | 1289783.69 | 275.21 | 697.85 | -60 | 135 |
5625N | KDH321 | 739397.19 | 1289752.77 | 271.70 | 487.10 | -60 | 135 |
5650N | KDH318 | 739318 | 1289873 | 274.1 | 376.00 | -60 | 135 |
5675N | KDH317 | 739368 | 1289853 | 273.8 | 701.20 | -60 | 135 |
5700N | KDH316 | 739384 | 1289869 | 273.8 | 601.35 | -60 | 135 |
5800N | KDH296 | 739742 | 1289661 | 269.3 | 100.00 | -55 | 135 |
KDH297 | 739777 | 1289626 | 268.4 | 99.32 | -55 | 135 | |
KDH305 | 739776 | 1289628 | 268.4 | 201.00 | -60 | 315 | |
5950N | KDH309 | 739852 | 1289771 | 270.2 | 442.20 | -60 | 315 |
KDH310 | 739616 | 1289995 | 270.4 | 172.00 | -55 | 135 | |
KDH313 | 739634 | 1289978 | 271.3 | 442.10 | -60 | 135 | |
KDH315 | 739725 | 1289892 | 272.3 | 223.25 | -58 | 135 | |
6000N | KDH298 | 739660 | 1290032 | 270.7 | 301.11 | -60 | 135 |
KDH311 | 739917 | 1289765 | 269.3 | 522.35 | -60 | 315 | |
KDH314 | 739761 | 1289926 | 271.4 | 250.40 | -58 | 135 | |
6050N | KDH312 | 739627 | 1290115 | 269.9 | 550.58 | -60 | 135 |
KDH319 | 739796 | 1289961 | 270.5 | 265.17 | -58 | 135 |
Under the guidelines of National Instrument 43-101, the qualified person for the Kiaka Gold Project is Mr. Guy Franceschi, Vice President, Exploration for Volta Resources. Mr. Franceschi is a member of the European Federation of Geologists and has reviewed and approved the contents of this news release.
Volta Resources has a portfolio of quality gold exploration projects in Burkina Faso and Ghana, both mining-friendly West African jurisdictions with proven world-class gold deposits. VTR will focus on fast-tracking its flagship Kiaka Gold Project (NI-43-101 compliant resources include 90.29 million tonnes @ 1.04 g/t Au for 3,018,000 ounces in the Measured and Indicated categories and 38.52 million tonnes @ 1.00 g/t Au for 1,260,000 ounces in the Inferred category [Please see VTR press release dated June 29, 2011]) towards a development decision, aiming to complete a Feasibility Study in Q1, 2013. Recent acquisition of properties around Kiaka have provided VTR with an extensive ground position along the highly prospective Markoye Fault Corridor in an important emerging gold province. VTR will also advance exploration at its Gaoua Copper-Gold Project, Nassara Gold Project and Titao Gold Project, all located in Burkina Faso.
Forward Looking Information Caution:
This press release presents "forward-looking statements" within the meaning of Canadian securities legislation that involve inherent risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold and other minerals and metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Volta Resources to be materially different from those expressed or implied by such forward looking statements, including but not limited to: risks related to international operations, risks related to the integration of acquisitions; risks related to joint venture operations; actual results of current exploration activities; actual results of current or future reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold and other minerals and metals; possible variations in ore reserves, grade or recovery rates; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. Although the management and officers of Volta Resources believe that the expectations reflected in such forward-looking statements are based upon reasonable assumptions and have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Volta Resources does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.
Figure 1: Location and highlights of reported drillholes.
PDF with caption: "Figure 1: Location and highlights of reported drillholes.". PDF available at: http://stream1.newswire.ca/media/2012/02/21/20120221_C5968_DOC_EN_10259.pdf
please refer to our website www.Voltaresources.com or contact:
Kevin Bullock, P.Eng., President & CEO
Tel: (647) 388-1842
Fax: (416) 867-2298
Email: kbullock@Voltaresources.com
or
Andreas Curkovic, Investor Relations
Tel: (416) 577-9927