Correct me if IM wrong (which is very likely)
Page 14,15,16,17 of presentatiion show previous cross and long section drill results that have produced not so very great width's. If those were previous mined width's then how was that mine profitable back in the days? The grades are not bad but the width's are low!
Now looking at the proposed drill holes. I counted 16 proposed holes. divide that by 2500m planned and you have an average of about 156m / 512ft per hole.
I can tell they have done homework and I guess we have to wait and see if this geo team is a successful one. I cannot remember the last time wildcat ever put together or spent this much time on a drill program. I've only been here 1.5yrs and have not gone into there historical news releases in depth. I try and stay current unlike traps that follows the ancient workings when our ancestor used a pick and hammer. (not a bad thing traps)
I hope they find something around Jeep. Odds should be stacked in our favor. As the saying goes: "best place to start looking is close to a existing mine"
Curious to see where the Reed and Foster budget is going to come from.