Emerging Graphene Technology Company

Hydrothermal Graphite Deposit Ammenable for Commercial Graphene Applications

Free
Message: Re: significant results from drilling on the East and West pipes

M02 (East) yielded 210.8 m @ 5.8% Cg from 50.5 m to 261.3 m within a wider intersection of 440.0 m of graphite mineralization grading 3.8% Cg from 50.5 m to 490.5 m.

  • Hole M01 (East) yielded 255.5 m @ 5.5% Cg from 48.0 m to 303.5 m within a wider intersection of 464.2 m of graphite mineralization grading 4.5% Cg from 48.0 m to 512.2 m.
  • Hole 44 (West) yielded 126.7 m @ 3.9% Cg from 93.3 m to 220.0 m within a wider intersection of 352.7 m of graphite mineralization grading 2.2% Cg from 68.1 m to 420.8 m.
  • The three holes above are fantastic but I like the continuity and grade of this one as well.....

    Hole 43 (East) yielded 117.0 m @ 7.4% Cg from 61.0 m to 178.0 m within a wider intersection of 170.0 m of graphite mineralization grading 7.0% Cg from 61.0 m to 231.0 m.

    Share
    New Message
    Please login to post a reply