No doubt about that Deputy, but what I was referring to was after the PEA is released the resource should be substantially larger. The whittle model was applied by RPA when the 43-101 was released. A substantial amount of known mineralization was excluded in the 43-101 at that time.
When the known value per tonne is released and if it is a high as we expect, it should result in an increase the value of the resource and expand the deposit.
Zen talked about a 20 year mine life in 2014, now talking 30. Gotta like it.
As for open at depth, I am hoping the miner who takes ZEN out at a premium will benefit from that.