I wonder had they factored in the unpredictable nature of the winter condition,they might have sent in the drills first(cost permitting) via helipcopter and started drilling ahead of the winter road.That way,the samples would have been there ready to be loaded and delivered.Is there any way that we can continue drilling throughout the spring and summer and have the samples ready for transport some time in the future?