Free
Message: NUNCHI IP SOON ?

Here's a link to Doni's previous posts about the issue. I hope Doni doesn't mind me reposting the link.

Yes, I agree, this is the biggest issue and the most important to get resolved in our favor. After that, it's full speed ahead.

The following is an excerpt taken from Doni's post

http://agoracom.com/ir/edigital/forums/discussion/topics/516361-examiner-is-not-budging-from-his-stand/?message_id=1638330#message_1638330

control circuitry 21, is Micro-controller 21

There are two sides to this consideration, the micro- controller and it's dedicated power source which represents "power source coupled to ---------> the control circuitry" and then there is the control circuitry and its dedicated power source which represents control circuitry--------> coupled to.....pick a device device.

It's way, in my prior post, for the phrase in question by the examiner "power source coupled to the control circuitry for supplying electrical power to the device.:"

That phrase represents the induction of an electrical power source to the flash memory socket, as that particular claim is about managing flash memory considerations.

I suggested the placement of the word relay.....as there is a relay action between the two dedicated and separate power sources.

power source coupled to-----> the control relay circuitry------> for supplying electrical power to the device.:

doni

Share
New Message
Please login to post a reply